93 Dy. E. E.<br />

ANNEXURE V<br />

i) The contractor at his shall have to make his own arrangement for bringing the water from outside.<br />

ii)<br />

For R.C.C. items, the wording, finishing the formed surface with C.M. 1:3 <strong>of</strong> sufficient minimum thickness to give a smooth and even surface is meant only<br />

for repairing the honeycombed surfaces and it does not include plastering <strong>of</strong> the whole <strong>of</strong> the surface.<br />

iii)<br />

Claim for change in (i) depth <strong>of</strong> foundation (ii) height <strong>of</strong> storey (iii) plinth height shall not be paid to the contractor.<br />

ANNEXUREVII<br />

1) Surface Requirement: - The item <strong>of</strong> textured plaster will have to be applied on cement plaster surface in absolute line and level the cement plaster surface<br />

should be free from dust and dirt. A deep penetrative primer will have to be applied on cement plastered surface.<br />

2) Application <strong>of</strong> textured Plaster: - A specially developed synthetic plaster like Renova/Eur<strong>of</strong>in will have to be applied over already prepared surface in two<br />

coats. The thickness <strong>of</strong> the each coat should be about 1 to 1.5 mm totalling the textured plaster thickness to about 2.5 to 3 Kg. per square meter for each single<br />

coat. The generation <strong>of</strong> grooves and pattern will have to be done as approved by the Architect over Second coat <strong>of</strong> textured plaster.<br />

3) Application <strong>of</strong> Paint: - Two coats <strong>of</strong> pure acrylic special paint <strong>of</strong> approved shade will have to be applied asfinalfinish<br />

The item is inclusive <strong>of</strong> erection <strong>of</strong> scaffolding, cost <strong>of</strong> all materials, making grooves as per the approved pattern, tools and plants and all sorts <strong>of</strong> labour.<br />

Contractor No. <strong>of</strong> correction Executive Engineer