88 Dy. E. E.<br />

should be got approved from the Engineer In charge. The entire responsibility for design, erection, and maintenance and safety measure<br />

will exclusively rest with the contractor. The Engineer In charge reserves right to reject entire Centring arrangement or part there<strong>of</strong> any<br />

material used for the cantering/formwork in the event <strong>of</strong> which the contractor shall have to arrange for its replacement at his own cost and<br />

claims, what so ever on this account shall not be entertained by the department.<br />

Contractor No. <strong>of</strong> correction Executive Engineer