81 Dy. E. E.<br />
Sr. Material Test Frequency <strong>of</strong> Testing Remarks.<br />
No.<br />
5 Steel i)Weight per meter One test for every 5.0 I.S. 432<br />
ii) Ultimate Tensile METRIC TONNE or part IS 1786-1985<br />
stress<br />
there<strong>of</strong> for each diameter.<br />
iii) Yield stress<br />
iv) Elongation<br />
6 Granular i)Gradation<br />
One test per 200 cum. M.ORTH.specification<br />
Sub Base ii) Aturberg limits One test per 200 cum. Table 900-3<br />
iii) Moisture content One test per 250 cum.<br />
.(fourth revision 01 )<br />
prior to compaction.<br />
iv) Density and One test per 500 cum<br />
compacted layer<br />
Theoretical Consumption <strong>of</strong> cement<br />
Sr No Item <strong>of</strong> <strong>Work</strong> Unit Theoretical<br />
Consumption <strong>of</strong><br />
cement in Bags<br />
1 Providing and laying in Situ cement in 1:4:8 – for foundation Cu.M 3.40<br />
----- etc complete<br />
2 Providing and laying in Situ cement concrete M-20 for Cu.M 7.10<br />
R.C.C work foundation ----- etc complete<br />
3 Providing and Casting in Situ cement concrete M-20 trap Cu.M 7.10<br />
Contractor No. <strong>of</strong> correction Executive Engineer