81 Dy. E. E.<br />

Sr. Material Test Frequency <strong>of</strong> Testing Remarks.<br />

No.<br />

5 Steel i)Weight per meter One test for every 5.0 I.S. 432<br />

ii) Ultimate Tensile METRIC TONNE or part IS 1786-1985<br />

stress<br />

there<strong>of</strong> for each diameter.<br />

iii) Yield stress<br />

iv) Elongation<br />

6 Granular i)Gradation<br />

One test per 200 cum. M.ORTH.specification<br />

Sub Base ii) Aturberg limits One test per 200 cum. Table 900-3<br />

iii) Moisture content One test per 250 cum.<br />

.(fourth revision 01 )<br />

prior to compaction.<br />

iv) Density and One test per 500 cum<br />

compacted layer<br />

Theoretical Consumption <strong>of</strong> cement<br />

Sr No Item <strong>of</strong> <strong>Work</strong> Unit Theoretical<br />

Consumption <strong>of</strong><br />

cement in Bags<br />

1 Providing and laying in Situ cement in 1:4:8 – for foundation Cu.M 3.40<br />

----- etc complete<br />

2 Providing and laying in Situ cement concrete M-20 for Cu.M 7.10<br />

R.C.C work foundation ----- etc complete<br />

3 Providing and Casting in Situ cement concrete M-20 trap Cu.M 7.10<br />