Name of Work Na - e-Tendering
Name of Work Na - e-Tendering
Name of Work Na - e-Tendering
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
86 Dy. E. E.<br />
ANNEXURE I<br />
SPECIFICATION<br />
Item: Providing and casting in situ M-20 grade (controlled) cement concrete trap metal <strong>of</strong> approved quality for RCC slab at desired places<br />
as per detailed designs and drawings or as directed including Centring, form work, compaction, finishing the formed surfaces with cement<br />
mortar <strong>of</strong> sufficient minimum thickness to give a smooth and even surface including niroo finish wherever necessary or roughening them if<br />
special finish is to be provided (excluding reinforcement) and curing etc. complete.<br />
The item refers to controlled cement concrete required for RCC terrace slab and such other slabs in building construction and is to be<br />
executed as per detailed specification enclosed.<br />
The salient and specific points in the specifications are as follows:<br />
i) Water cement content shall not exceed 0.42.<br />
ii) Minimum cement content shall not be less than 350 Kg. per cubic meter.<br />
iii) Admixture such as water reducing admixtures / Air entraining admixtures and super plasticizer <strong>of</strong> proprietary product like melamine<br />
based supercon - 100 etc. to improve workability, durability and to reduce permeability, considering the restrain in W/C ratio.<br />
iv)Maximum size <strong>of</strong> aggregate shall not be exceed 20 mm.<br />
v) Provision <strong>of</strong> cover blocks <strong>of</strong> the same strength <strong>of</strong> the concrete and manufactured to the specified dimension <strong>of</strong> the other approved<br />
construction material such as plastic at 30 cm. centre to centre.<br />
vi) Compaction shall necessarily be done by Mechanical Vibrators such as screwed vibrators.<br />
vii) Placement <strong>of</strong> Plastic paper or polythene sheet on Centring before placing concrete mix.<br />
Contractor No. <strong>of</strong> correction Executive Engineer