wherever there is a doubt about the workmanship or the safety <strong>of</strong> the bridge component or<br />

whenever there is a need to confirm the workmanship and the safety <strong>of</strong> the structure by<br />

carrying the load test. The load testing shall be carried out as per specifications B.R. 58 <strong>of</strong> the<br />

book <strong>of</strong> standard specifications published by B & C Department, Govt. <strong>of</strong> Maharashtra, with<br />

such specifications as ordered by Engineer in charge.<br />

(1) The load for such load test shall be full dead load (excluding self load <strong>of</strong> the member<br />

under test) plus 125 % maximum design live load (including impact) in case <strong>of</strong> R.C.<br />

bridges.<br />

(2) The load testing will be carried out by the department through a suitable competent<br />

agency. Test results from such agency as will be fixed by department will be binding on<br />

the contractor.<br />

(3) If the result <strong>of</strong> the load test are not found to be satisfactory, the contractor shall<br />

strengthen the already cast member or reconstruct the members at his cost and also<br />

bear the cost <strong>of</strong> load test. The decision <strong>of</strong> the Engineer in charge will be final in this<br />

case.<br />

43. SPECIAL CONDITIONS :<br />

43.1 The contractors should ensure that all safety precautions are observed by their labours,<br />

working closed to the State Highway and while closing the state Highway precautions<br />

are taken including insurance etc., for their labour at the cost <strong>of</strong> the contractor etc. if any<br />

accident occur to the labour etc., no claim in this regard on whatsoever account shall be<br />

entertained and the decision <strong>of</strong> the Department will be final and conclusive.<br />

43.2 During the execution if there is any change in:<br />

(i) Span Arrangement.<br />

(ii) Height <strong>of</strong> substructure and superstructure above ground level.<br />

(iii) Change in the depth <strong>of</strong> foundation, tendered rate for respective items will hold good<br />

and no extra claims shall be entertained on this account.<br />

43.3 Contractor shall observe the rules and regulations empowered by traffic police for<br />

smooth flow <strong>of</strong> traffic on the diversion road and shall not be entitled for claim any<br />

compensation arising there<strong>of</strong>.<br />

44. DEFINITIONS:<br />

(a) Government: Unless included by or repugnant to the contents the expression<br />

"Government" as used in the tender documents shall mean the IDW, NRHM CELL,<br />

HEALTH DEPARTMENT, Z P Akola <strong>of</strong> the Government <strong>of</strong> Maharashtra.<br />

(b) CEO/ DHO: The expression 'The CEO/ DHO/ Chief Engineer' as used in the tender<br />

papers shall mean CEO/ DHO, Z P Akola.<br />

(c) CEO/ Superintending Engineer: The expression 'CEO/ Superintending Engineer' as<br />

used in the tender papers shall mean the <strong>of</strong>ficer <strong>of</strong> Superintending Engineer's ranks (by<br />

whatever designation he may be known) under whose control the work lies for the time<br />

being.<br />

(d) Engineer-in-charge: The expression Engineer or Engineer-in-charge as used in the<br />

tender paper shall mean the Engineer-in-charge <strong>of</strong> the work.<br />

(e) Contractor: The expression 'Contractor' as used in the tender papers shall mean the<br />

successful tenderer that is the tenderer whose tender has been accepted and who has<br />

been authorised to proceed with the work.<br />

(f) Contract: The expression 'Contract' as used in the tender papers shall mean the deed <strong>of</strong><br />

contract together with all its original accompaniments and those later incorporated in it<br />

by mutual consent.<br />

(g) Plant: The expression 'Plant' as used in the tender papers shall mean every temporary<br />

accessory necessary or considered necessary by the Engineer to execute, construct,<br />

complete and maintain the work and all altered, modified, substituted and additional<br />

works ordered in the time and the manner herein provided and all temporary materials<br />

Contractor No <strong>of</strong> Correction Deputy Engineer 65