wherever there is a doubt about the workmanship or the safety <strong>of</strong> the bridge component or<br />
whenever there is a need to confirm the workmanship and the safety <strong>of</strong> the structure by<br />
carrying the load test. The load testing shall be carried out as per specifications B.R. 58 <strong>of</strong> the<br />
book <strong>of</strong> standard specifications published by B & C Department, Govt. <strong>of</strong> Maharashtra, with<br />
such specifications as ordered by Engineer in charge.<br />
(1) The load for such load test shall be full dead load (excluding self load <strong>of</strong> the member<br />
under test) plus 125 % maximum design live load (including impact) in case <strong>of</strong> R.C.<br />
bridges.<br />
(2) The load testing will be carried out by the department through a suitable competent<br />
agency. Test results from such agency as will be fixed by department will be binding on<br />
the contractor.<br />
(3) If the result <strong>of</strong> the load test are not found to be satisfactory, the contractor shall<br />
strengthen the already cast member or reconstruct the members at his cost and also<br />
bear the cost <strong>of</strong> load test. The decision <strong>of</strong> the Engineer in charge will be final in this<br />
case.<br />
43. SPECIAL CONDITIONS :<br />
43.1 The contractors should ensure that all safety precautions are observed by their labours,<br />
working closed to the State Highway and while closing the state Highway precautions<br />
are taken including insurance etc., for their labour at the cost <strong>of</strong> the contractor etc. if any<br />
accident occur to the labour etc., no claim in this regard on whatsoever account shall be<br />
entertained and the decision <strong>of</strong> the Department will be final and conclusive.<br />
43.2 During the execution if there is any change in:<br />
(i) Span Arrangement.<br />
(ii) Height <strong>of</strong> substructure and superstructure above ground level.<br />
(iii) Change in the depth <strong>of</strong> foundation, tendered rate for respective items will hold good<br />
and no extra claims shall be entertained on this account.<br />
43.3 Contractor shall observe the rules and regulations empowered by traffic police for<br />
smooth flow <strong>of</strong> traffic on the diversion road and shall not be entitled for claim any<br />
compensation arising there<strong>of</strong>.<br />
44. DEFINITIONS:<br />
(a) Government: Unless included by or repugnant to the contents the expression<br />
"Government" as used in the tender documents shall mean the IDW, NRHM CELL,<br />
HEALTH DEPARTMENT, Z P Akola <strong>of</strong> the Government <strong>of</strong> Maharashtra.<br />
(b) CEO/ DHO: The expression 'The CEO/ DHO/ Chief Engineer' as used in the tender<br />
papers shall mean CEO/ DHO, Z P Akola.<br />
(c) CEO/ Superintending Engineer: The expression 'CEO/ Superintending Engineer' as<br />
used in the tender papers shall mean the <strong>of</strong>ficer <strong>of</strong> Superintending Engineer's ranks (by<br />
whatever designation he may be known) under whose control the work lies for the time<br />
being.<br />
(d) Engineer-in-charge: The expression Engineer or Engineer-in-charge as used in the<br />
tender paper shall mean the Engineer-in-charge <strong>of</strong> the work.<br />
(e) Contractor: The expression 'Contractor' as used in the tender papers shall mean the<br />
successful tenderer that is the tenderer whose tender has been accepted and who has<br />
been authorised to proceed with the work.<br />
(f) Contract: The expression 'Contract' as used in the tender papers shall mean the deed <strong>of</strong><br />
contract together with all its original accompaniments and those later incorporated in it<br />
by mutual consent.<br />
(g) Plant: The expression 'Plant' as used in the tender papers shall mean every temporary<br />
accessory necessary or considered necessary by the Engineer to execute, construct,<br />
complete and maintain the work and all altered, modified, substituted and additional<br />
works ordered in the time and the manner herein provided and all temporary materials<br />
Contractor No <strong>of</strong> Correction Deputy Engineer 65