ADDITIONAL CONDITIONS FOR CEMENT, STEEL, BITUMEN BROUGHT BY THE CONTRACTOR.<br />

1) All the materials required for construction <strong>of</strong> work shall be arranged by the contractor<br />

at his own cost. The samples <strong>of</strong> material to be procured shall be got approved by the Engineerin-charge<br />

and material as per approved samples shall only be procured.<br />

2) The contractor shall submit periodically as well as on completion <strong>of</strong> work, an account <strong>of</strong><br />

all materials brought by him in a manner as directed by Engineer-in-charge. The contractor<br />

shall also furnish monthly account <strong>of</strong> materials; a separate register shall be maintained on site<br />

for recording daily item wise receipt and consumption <strong>of</strong> Cement, Steel and Asphalt used by<br />

him, also item wise consumption <strong>of</strong> other materials used. This register shall be signed daily by<br />

the contractor or his representative and representative <strong>of</strong> Engineer-in-charge.<br />

3) All the materials required for the work shall be brought by the contractor at his own cost.<br />

In each case, certificate for its quality and quantity shall be produced by the contractor at his<br />

own cost and the test results <strong>of</strong> samples shall be supplied to the Department. The material not<br />

confirming to the required standard shall be removed at once from the site <strong>of</strong> the work by the<br />

Contractor at his own cost.<br />

4) Testing <strong>of</strong> all construction material shall be carried out as per required frequency and<br />

specifications and the charges for testing shall be borne by the contractor<br />

5) All the testing charges for mix design etc. if necessary on construction work shall be<br />

borne by the contractor.<br />

6) The contractor shall construct shed / sheds as per direction <strong>of</strong> the Engineer-in-charge <strong>of</strong><br />

the work for storing the materials brought at site. The material shall be taken out for use in the<br />

presence <strong>of</strong> the departmental representative only.<br />

7) The contractor shall make his own arrangement for the safe custody <strong>of</strong> the materials<br />

which are brought for construction <strong>of</strong> work.<br />

8) The contractor shall not transfer any material once brought at work site without prior<br />

written permission from Engineer-in-charge and for bonafied reasons only.<br />

9) In case the materials brought by the contractor become surplus owing to the change in<br />

the design <strong>of</strong> the work, the materials should be taken back by the contractor at his own cost<br />

after prior permission <strong>of</strong> the Engineer-in-charge.<br />

10) The charge for conveyance <strong>of</strong> materials from the place <strong>of</strong> delivery to the site <strong>of</strong> work and<br />

the actual sport on work site shall be entirely borne by the contractor. No claims on his account<br />

shall be entertained.<br />

11) The contractor shall furnish the account <strong>of</strong> cement, steel, asphalt brought by him at each<br />

time before placing orders for further supply. Also the same should submit on completion <strong>of</strong> the<br />

work, final account <strong>of</strong> the materials used by him to the Department. This account will be<br />

bituminized by the Engineer-in-charge.<br />

12) All empty cement bags or empty asphalt drums shall be the property <strong>of</strong> contractor and<br />

the same shall be removed immediately after completion <strong>of</strong> work.<br />

13) The contractor shall procure the pipes if required for this work from M.S.S.I.D.C. only.<br />

Pro<strong>of</strong> <strong>of</strong> purchasing <strong>of</strong> pipe should be submitted.<br />

.<br />

Contractor No <strong>of</strong> Correction Deputy Engineer 73