ADDITIONAL CONDITIONS FOR CEMENT, STEEL, BITUMEN BROUGHT BY THE CONTRACTOR.<br />
1) All the materials required for construction <strong>of</strong> work shall be arranged by the contractor<br />
at his own cost. The samples <strong>of</strong> material to be procured shall be got approved by the Engineerin-charge<br />
and material as per approved samples shall only be procured.<br />
2) The contractor shall submit periodically as well as on completion <strong>of</strong> work, an account <strong>of</strong><br />
all materials brought by him in a manner as directed by Engineer-in-charge. The contractor<br />
shall also furnish monthly account <strong>of</strong> materials; a separate register shall be maintained on site<br />
for recording daily item wise receipt and consumption <strong>of</strong> Cement, Steel and Asphalt used by<br />
him, also item wise consumption <strong>of</strong> other materials used. This register shall be signed daily by<br />
the contractor or his representative and representative <strong>of</strong> Engineer-in-charge.<br />
3) All the materials required for the work shall be brought by the contractor at his own cost.<br />
In each case, certificate for its quality and quantity shall be produced by the contractor at his<br />
own cost and the test results <strong>of</strong> samples shall be supplied to the Department. The material not<br />
confirming to the required standard shall be removed at once from the site <strong>of</strong> the work by the<br />
Contractor at his own cost.<br />
4) Testing <strong>of</strong> all construction material shall be carried out as per required frequency and<br />
specifications and the charges for testing shall be borne by the contractor<br />
5) All the testing charges for mix design etc. if necessary on construction work shall be<br />
borne by the contractor.<br />
6) The contractor shall construct shed / sheds as per direction <strong>of</strong> the Engineer-in-charge <strong>of</strong><br />
the work for storing the materials brought at site. The material shall be taken out for use in the<br />
presence <strong>of</strong> the departmental representative only.<br />
7) The contractor shall make his own arrangement for the safe custody <strong>of</strong> the materials<br />
which are brought for construction <strong>of</strong> work.<br />
8) The contractor shall not transfer any material once brought at work site without prior<br />
written permission from Engineer-in-charge and for bonafied reasons only.<br />
9) In case the materials brought by the contractor become surplus owing to the change in<br />
the design <strong>of</strong> the work, the materials should be taken back by the contractor at his own cost<br />
after prior permission <strong>of</strong> the Engineer-in-charge.<br />
10) The charge for conveyance <strong>of</strong> materials from the place <strong>of</strong> delivery to the site <strong>of</strong> work and<br />
the actual sport on work site shall be entirely borne by the contractor. No claims on his account<br />
shall be entertained.<br />
11) The contractor shall furnish the account <strong>of</strong> cement, steel, asphalt brought by him at each<br />
time before placing orders for further supply. Also the same should submit on completion <strong>of</strong> the<br />
work, final account <strong>of</strong> the materials used by him to the Department. This account will be<br />
bituminized by the Engineer-in-charge.<br />
12) All empty cement bags or empty asphalt drums shall be the property <strong>of</strong> contractor and<br />
the same shall be removed immediately after completion <strong>of</strong> work.<br />
13) The contractor shall procure the pipes if required for this work from M.S.S.I.D.C. only.<br />
Pro<strong>of</strong> <strong>of</strong> purchasing <strong>of</strong> pipe should be submitted.<br />
.<br />
Contractor No <strong>of</strong> Correction Deputy Engineer 73