22.11.2014 Views

Name of Work Na - e-Tendering

Name of Work Na - e-Tendering

Name of Work Na - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11.3 No Materials brought to site shall be removed from the site without prior approval <strong>of</strong> the<br />

Engineer –in-charge<br />

12. 12.1The contractor shall inform the Engineer in charge in writing when any portion <strong>of</strong> the<br />

work is ready for inspection giving him sufficient notice to enable him to inspect these without<br />

affecting the further progress <strong>of</strong> the work.<br />

12.2 The contractor shall provide at his cost necessary ladders and such arrangements as are<br />

considered safe by the Engineer in charge for proper inspection <strong>of</strong> all parts <strong>of</strong> the work.<br />

12.3 The contractor shall extend his full co-operation and make all necessary arrangement<br />

when needed for carrying out inspection <strong>of</strong> the work or any part <strong>of</strong> the<br />

work by the local representative , M.L.A's M.P.'s and <strong>of</strong>ficers and dignitaries / delegates <strong>of</strong><br />

various Government department, local bodies, private sectors etc. no compensation shall be<br />

paid to the Contractor on this account.<br />

13. PRECAUTIONS TO BE TAKEN BY CONTRACTOR :<br />

13.1 The work shall be carried out by the contractor without causing damage to the existing<br />

Govt. property and / or private property. If any such damages are caused the contractor shall<br />

pay for restoration <strong>of</strong> the property to the original condition and any other consequent damages.<br />

13.2 In the event <strong>of</strong> an accident involving serious injuries or death <strong>of</strong> any persons, at site <strong>of</strong><br />

work or quarry or at place in connection with the work the same shall be reported in writing<br />

within 24 hours <strong>of</strong> the occurrence to the Engineer in charge and the Commissioner <strong>of</strong><br />

workmen's compensation.<br />

14. CLEARANCE OF SITE ON COMPLETION OF WORK:<br />

The contractor after completion <strong>of</strong> work shall clean the site <strong>of</strong> all debris and remove all<br />

unused materials other than those supplied by the department and all plant and machinery<br />

equipment, tools, etc. belonging to him within one month from the date <strong>of</strong> completion <strong>of</strong> the<br />

work, or otherwise the same will be removed by the department at his cost or disposed <strong>of</strong>f as<br />

per departmental procedure. In case the materials is disposed <strong>of</strong>f by department, the sale<br />

proceeds will be credited to the contractor's account after deducting the cost sale incurred.<br />

However no claim <strong>of</strong> the contractor regarding the price or amount credited will be entertained<br />

afterwards.<br />

15. REMOVAL OF CONSTRUCTIONAL PLANT WITH PRIOR PRMISSION :<br />

All constructional plant, provided by the contractor shall when brought on the site be<br />

deemed to be exclusively intended for the construction and the contractor shall not remove the<br />

same or any part there<strong>of</strong> (Save for the purpose <strong>of</strong> moving it from one part to the site to another)<br />

without the consent in writing <strong>of</strong> the engineer in charge who shall record the reasons for with<br />

holding the consent.<br />

16. RESTRICTIONS BECUASE OF LOCAL TRAFFIC :<br />

As there is local traffic by the side <strong>of</strong> construction <strong>of</strong> the work, the contractor will have to<br />

take proper precautions such as proper barricading, fencing, lighting, information and<br />

cautionary boards for safe and smooth flow <strong>of</strong> traffic, and keeping the concerned authorities<br />

informed about the work in progress.<br />

Contractor No <strong>of</strong> Correction Deputy Engineer 54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!