95 Dy. E. E.<br />
(iii) All necessary labour, materials and use <strong>of</strong> tools for the satisfactory completion <strong>of</strong> the works.<br />
5. Mode <strong>of</strong> Measurement: The contract rate shall be per Square metre <strong>of</strong> the completed work as specified. The length shall be recorded correct up to a cm and<br />
area to be calculated 0.01 square metre.<br />
Contractor No. <strong>of</strong> correction Executive Engineer