Name of Work Na - e-Tendering
Name of Work Na - e-Tendering
Name of Work Na - e-Tendering
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
knowledge <strong>of</strong> Department but without any guarantee about it.<br />
2.2 It is presumed that the contractor has carefully gone through the works specifications.<br />
P.W.D. Hand Book and the Schedule <strong>of</strong> rates <strong>of</strong> the division and studied the site conditions<br />
before arriving at the rates quoted by him.<br />
3. TREASURE TROVE :<br />
In the event <strong>of</strong> discovery by the contractor or his employees during the progress <strong>of</strong> the<br />
works <strong>of</strong> the any treasure, fossils, minerals or any other article <strong>of</strong> value or interest, the<br />
contractor shall give immediate intimation there<strong>of</strong> to the Engineer. And forth with mark<br />
over to the Engineer his representative such treasure or things, which shall be the<br />
property <strong>of</strong> Government.<br />
3 –A LAYOUT OF WORK<br />
Layout <strong>of</strong> the work will be done by the contractor in consultation with the Executive<br />
Engineer, <strong>of</strong> the department or his representative. Some permanent marks should<br />
however be established to indicate the demarcation <strong>of</strong> the structures or any component<br />
there<strong>of</strong> made to this permanent marks in measurement books and drawing, signed by<br />
the contractor and the departmental <strong>of</strong>ficer, responsibility regarding layout will be joint.<br />
4. AGENT AND WORK ORDER BOOK :<br />
4.1 The contractor shall himself engage an authorised all time agent on the work capable <strong>of</strong><br />
managing and guiding the work and understanding the specifications and contract conditions. A<br />
qualified and experienced Engineer shall be provided by the contractor as his agent for<br />
technical matters. Site engineer can also be designated as an agent <strong>of</strong> the contractor. Agent<br />
will take orders as will be given by the Executive Engineer or his representative and shall be<br />
responsible for carrying them out. This agent shall not be changed without prior intimation <strong>of</strong><br />
the Executive Engineer and his representative on the work site. The Engineer-in-charge have<br />
the unquestionable right to ask for changes in the quality and strength <strong>of</strong> supervisory staff <strong>of</strong><br />
contractor and to order removal from work <strong>of</strong> any <strong>of</strong> such staff. The contractor shall comply with<br />
such order and effect replacements <strong>of</strong> the satisfaction <strong>of</strong> the Engineer-in-charge.<br />
4.2 A work order book shall be maintained on site and it shall be the property <strong>of</strong><br />
Government and the contractor shall promptly sign orders given therein by the Executive<br />
Engineer or his representative and his superior <strong>of</strong>ficer, and comply with them. The compliance<br />
shall be reported by contractor to the Engineer in good time so that it can be checked, the blank<br />
work order book, with machine numbered pages will be provided by the Department free <strong>of</strong><br />
charge for this purpose. The contractor will be allowed to copy out the instruction therein from<br />
time to time.<br />
5. INITIAL MEASUREMENT OF RECORD:<br />
Where for proper measurements <strong>of</strong> the work it is necessary to have an initial set <strong>of</strong> levels or<br />
other measurements taken the same as recorded in the authorised field book or M.B. <strong>of</strong><br />
Government by the Engineer or his authorised representative will be signed by the contractor<br />
who will be entitled to have a true copy <strong>of</strong> same made at his cost. Any failure on the part <strong>of</strong> the<br />
contractor who will be entitled to have a true copy <strong>of</strong> same made at his cost. Any failure on the<br />
part <strong>of</strong> the contractor to get such level etc. recorded before starting the work will render him<br />
liable to accept the decision <strong>of</strong> the Engineer as to basis <strong>of</strong> taking measurements and will be<br />
binding on contractor Likewise the contractor will not carry out any work which will render its<br />
subsequent measurement difficult or impossible without first getting the same jointly measured<br />
and recorded by himself and the authorised representative <strong>of</strong> the Engineer. The record <strong>of</strong> such<br />
measurement maintained by Government shall be signed by the contractor and he will be<br />
entitled to have a true copy <strong>of</strong> the same made at his cost.<br />
6. CUSTODY OF WORK:<br />
All work and materials before being finally taken over by Government will be the entire liability<br />
<strong>of</strong> the contractor for guarding, maintaining and making good any damages <strong>of</strong> any magnitude. It<br />
Contractor No <strong>of</strong> Correction Deputy Engineer 52