22.11.2014 Views

feasibility study of real time parking information at ... - WMATA.com

feasibility study of real time parking information at ... - WMATA.com

feasibility study of real time parking information at ... - WMATA.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>WMATA</strong> Real-Time Parking<br />

Inform<strong>at</strong>ion Feasibility Study<br />

Study Area<br />

Chapter 1: INTRODUCTION<br />

The focus <strong>of</strong> this <strong>study</strong> is on the potential <strong>feasibility</strong> <strong>of</strong> <strong>real</strong>-<strong>time</strong> <strong>parking</strong> <strong>inform<strong>at</strong>ion</strong><br />

applic<strong>at</strong>ions <strong>at</strong> four Virginia Metrorail st<strong>at</strong>ions, namely:<br />

• Franconia/Springfield<br />

• Vienna/Fairfax<br />

• Van Dorn<br />

• West Falls Church<br />

Report Present<strong>at</strong>ion<br />

This report is a condensed <strong>com</strong>pil<strong>at</strong>ion <strong>of</strong> a series <strong>of</strong> technical memoranda. The report<br />

covers the basic tasks, highlighting the proposed technology and the benefits <strong>of</strong> the <strong>real</strong><strong>time</strong><br />

<strong>parking</strong> applic<strong>at</strong>ion. Subsequent chapters include:<br />

• Chapter 2: Existing Parking Conditions<br />

• Chapter 3: Best Practices Review<br />

• Chapter 4: Real-Time Parking Technology<br />

• Chapter 5: Options and Preferred System for <strong>WMATA</strong><br />

• Chapter 6: Pilot Project Concept<br />

The technical memoranda th<strong>at</strong> can be referred to for more <strong>inform<strong>at</strong>ion</strong> include:<br />

• Existing Parking Conditions (July 9, 2008)<br />

• Evalu<strong>at</strong>ion <strong>of</strong> Practices in Real Time Parking Inform<strong>at</strong>ion (July 3, 2009)<br />

• Technical Memorandum Task 3B: Requirements and Technologies (March 2009)<br />

• Technical Memorandum Task 3C: Supporting Applic<strong>at</strong>ions for Real-Time Parking<br />

Inform<strong>at</strong>ion (March 2009)<br />

• Technical Memorandum Task 3D: System Concept for Generic <strong>WMATA</strong> St<strong>at</strong>ion<br />

(May 2009)<br />

• Technical memorandum Task 4: Pilot Project Concept<br />

Page 1-2 June 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!