feasibility study of real time parking information at ... - WMATA.com
feasibility study of real time parking information at ... - WMATA.com
feasibility study of real time parking information at ... - WMATA.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>WMATA</strong> Real-Time Parking<br />
Inform<strong>at</strong>ion Feasibility Study<br />
Entering Traffic<br />
Chapter 2: EXISTING PARKING CONDITIONS<br />
Currently, the g<strong>at</strong>es <strong>at</strong> each <strong>of</strong> the garages/lots are open until the <strong>parking</strong> contractor<br />
arrives somewhere around 10:00 AM. Once the <strong>parking</strong><br />
contractor arrives they review the garage/lot for available<br />
spaces. If there are no spaces available, the contractor will<br />
place a “Lot Full” sign in the entrance roadway. Over the<br />
course <strong>of</strong> the day, the <strong>parking</strong> contractor will drive through the<br />
garages and lots to determine whether there are available<br />
<strong>parking</strong> spaces. If the determin<strong>at</strong>ion is made there are enough<br />
spaces available, the contractor will remove the signs until the<br />
next <strong>time</strong> the lot fills up. Drivers in the <strong>parking</strong> lot <strong>at</strong> 10:30 AM<br />
or l<strong>at</strong>er must pay to exit the <strong>parking</strong> facility. Figure 2-10 shows<br />
the entering traffic p<strong>at</strong>terns <strong>at</strong> all four st<strong>at</strong>ions <strong>com</strong>bined.<br />
Figure 2-11 shows the same <strong>inform<strong>at</strong>ion</strong> for each individual<br />
st<strong>at</strong>ion.<br />
1200<br />
Figure 2-10 Entering Traffic <strong>at</strong> All St<strong>at</strong>ions<br />
1141<br />
Peak Hour: 6:45-7:45 AM;<br />
1000<br />
Number <strong>of</strong> Entering Vehicles<br />
800<br />
600<br />
400<br />
200<br />
0<br />
5:00 AM<br />
5:15 AM<br />
5:30 AM<br />
5:45 AM<br />
6:00 AM<br />
6:15 AM<br />
6:30 AM<br />
6:45 AM<br />
7:00 AM<br />
7:15 AM<br />
7:30 AM<br />
7:45 AM<br />
8:00 AM<br />
8:15 AM<br />
8:30 AM<br />
8:45 AM<br />
9:00 AM<br />
9:15 AM<br />
9:30 AM<br />
9:45 AM<br />
10:00 AM<br />
10:15 AM<br />
10:30 AM<br />
10:45 AM<br />
11:00 AM<br />
11:15 AM<br />
11:30 AM<br />
11:45 AM<br />
12:00 PM<br />
12:15 PM<br />
12:30 PM<br />
12:45 PM<br />
1:00 PM<br />
1:15 PM<br />
1:30 PM<br />
1:45 PM<br />
2:00 PM<br />
Time - Period Beginning<br />
Page 2-17 June 2009