27.11.2014 Views

Table Of Contents

Table Of Contents

Table Of Contents

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.6 Temperature Calibration Check<br />

It is recommended that the ITC temperature calibration be checked approximately once<br />

every 12 months. The measured temperatures should be within +/- 0.2 degrees of the set<br />

temperatures in the iTC 200 software. This procedure requires a Control Company digital meter<br />

and submersible probe or equivalent. The Control Company meter is model #9612; the probe is<br />

model #4021.<br />

Make sure the cells are clean, and load them with degassed, distilled water. Residue in<br />

the cells or empty cells will yield unpredictable results. Insert the probe into the sample cell and<br />

turn it on.<br />

1. Use the “Temperature” control box under the “Instrument Controls” tab in the iTC 200<br />

software to set the temperature to 30°C.<br />

2. Set the Plot Idle Data flag so that the current data is displayed.<br />

3. When the instrument is thermostatting at the target temperature, the DP has settled at a<br />

negative, stable value, and the DT is 0, use the data reader tool and the display from the<br />

meter to take temperature data points, as close together as possible.<br />

4. Repeat for the second check point at 70°C. If the error for each is not less than 0.2°C, please<br />

contact MicroCal for assistance.<br />

It is recommended that users keep a log with the date of the calibration check and the software<br />

and meter readings for each temperature point.<br />

48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!