25.12.2014 Views

EWP Hangers - USP Connectors

EWP Hangers - USP Connectors

EWP Hangers - USP Connectors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Beam <strong>Hangers</strong> – HLBH series<br />

Heavy-duty hanger for LVL, LSL, and PSL beams.<br />

<strong>EWP</strong> <strong>Hangers</strong><br />

Materials: See <strong>EWP</strong> Top Mount <strong>Hangers</strong> charts,<br />

pages 132-136, 138-142.<br />

Finish: <strong>USP</strong> primer<br />

Options: See Specialty Options Chart.<br />

Codes: Load values are derived from data<br />

submitted to various North American<br />

building code evaluators.<br />

Installation:<br />

• Use all specified fasteners. See Product Notes, page 10.<br />

• For welded installations, see page 213.<br />

• 16d ring shank nails are supplied with HLBH hangers<br />

HLBH Nailer Options – chart represents maximum factored resistance<br />

for hangers used on wood nailers. Reference page 117.<br />

Fastener Schedule 3<br />

Factored Resistance 2<br />

Header Joist DF-L (Lbs) DF-L (kN) S-P-F (Lbs)<br />

S-P-F (kN)<br />

<strong>USP</strong><br />

Series<br />

Nailer<br />

Size Qty Type Qty Type<br />

Vertical<br />

100%<br />

Uplift 1<br />

115%<br />

Vertical<br />

100%<br />

Uplift 1<br />

115%<br />

Vertical<br />

100%<br />

Uplift 1<br />

115%<br />

Vertical<br />

100%<br />

Uplift 1<br />

115%<br />

HLBH<br />

4X 15 NA16D-RS 6 10d x 1-1/2 13825 1430 61.50 6.36 12840 1235 57.12 5.49<br />

4X 15 NA16D-RS 6 16d 13825 1770 61.50 7.87 12840 1430 57.12 6.36<br />

1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake;<br />

reduce for other load durations in accordance with the code.<br />

2) Listed loads shall not be increased.<br />

3) NAILS<br />

red font.<br />

4 3 /8˝<br />

Typical HLBH<br />

installation<br />

W<br />

L<br />

D<br />

HLBH<br />

H<br />

TF<br />

© Copyright 2013 <strong>USP</strong> Structural <strong>Connectors</strong> ®<br />

Specialty Options Chart – refer to Specialty Options pages 210 and 212 for additional details.<br />

Option Skewed 1,3 Sloped Seat 2,3 Sloped / Skewed 1,2,3 Sloped Top Flange 4 Top Flange Offset Saddle 5 Ridge<br />

Range <br />

<br />

<br />

<br />

<br />

Factored<br />

<br />

<br />

<br />

Resistance<br />

<br />

<br />

<br />

See footnote 5.<br />

<br />

<br />

Ordering<br />

SK, <br />

(R) (L),<br />

<br />

<br />

SL, <br />

(U) (D),<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

SF, <br />

(R) (L),<br />

<br />

<br />

S, <br />

(R) (L),<br />

<br />

<br />

SA, <br />

<br />

<br />

<br />

DA, <br />

<br />

<br />

<br />

Top Flange <strong>Hangers</strong> – MPH, PHM & PHXU series<br />

MPH – Designed to work with standard 6˝ or larger grouted concrete block wall construction. Eliminates<br />

the need for masons to fabricate special seats to support I-Joists or composite wood beams.<br />

PHM & PHXU – Used to connect LVL, LSL, and PSL beams to headers in medium load conditions<br />

using standard nails.<br />

Install with (2)<br />

16d duplex nails<br />

in grouted cells<br />

Materials: See <strong>EWP</strong> Top Mount <strong>Hangers</strong> charts, pages 128-142.<br />

Finish: <strong>USP</strong> primer; PHXU – G90 galvanizing<br />

Options: See Speciality Options Chart on page 127.<br />

Codes: Load values are derived from data submitted tvarious<br />

North American building code evaluators.<br />

Installation:<br />

• Use all specified fasteners. See Product Notes, page 10.<br />

• For MPH series: 16d duplex nails are not provided. Place hanger on top of concrete block. Install<br />

(2) 16d duplex nails (8 gauge or 0.162˝ dia. x 31⁄2˝ double head) in the grouted cavity, and then<br />

continue laying the next course of block. Larger holes on top flange are provided to aid grout flow. A<br />

minimum of one course must be laid over hanger top flange and one course below hanger top<br />

flange. Courses adjacent to the top flange shall be subsequently grouted.<br />

• For PHM & PHXU welded installations, see page 213.<br />

126<br />

1-800-328-5934 • www.<strong>USP</strong>connectors.com<br />

Typical MPH<br />

installation<br />

continued on next page

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!