EWP Hangers - USP Connectors
EWP Hangers - USP Connectors
EWP Hangers - USP Connectors
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Rafter Ties – HC520, HCPRS, HHCP2, LFTA6 & RT series cont.<br />
Installation:<br />
• Use all specified fasteners. See Product Notes, page 10.<br />
• All nail holes must be filled with specified nails to achieve loads listed in the chart. For substituting<br />
with different nail sizes, refer to “Optional Nails” chart on page 15 or consult a design professional.<br />
• Depending on pitch, birdsmouth notching may be required with some models to enable installers to<br />
fill all nail holes. Consult a design professional for appropriate notching.<br />
• Designer shall determine if solid blocking is required.<br />
Truss & Rafter<br />
Fastener Schedule 3<br />
Factored Resistance (115%) 1<br />
<strong>USP</strong><br />
Steel<br />
Truss/Rafter Plate Stud<br />
DF-L (Lbs)<br />
DF-L (kN)<br />
S-P-F (Lbs)<br />
S-P-F (kN)<br />
Stock No. Ref. No. Gauge Qty Type Qty Type Qty Type F1 F2 Uplift F1 F2 Uplift F1 F2 Uplift F1 F2 Uplift<br />
RT3A<br />
H3,<br />
S/H3<br />
18 4 8d 4 8d -- -- -- -- 310 310 1190 1.38 1.38 5.29 265 265 1020 1.18 1.18 4.54<br />
RT4 H4 18 4 8d 4 8d -- -- -- -- 350 350 760 1.56 1.56 3.38 300 300 650 1.33 1.33 2.89<br />
RT5 H5 18 4 8d 4 8d -- -- -- -- 425 425 995 1.89 1.89 4.43 365 365 855 1.62 1.62 3.80<br />
RT6 HS24 18 8 10d x 1-1/2 6 10d x 1-1/2 -- -- -- -- 1310 1310 1070 5.83 5.83 4.76 1125 1125 915 5.00 5.00 4.07<br />
H2.5,<br />
RT7 H2.5T, 18 5 8d 5 8d -- -- -- -- 315 315 940 1.40 1.40 4.18 270 270 805 1.20 1.20 3.58<br />
S/H2.5<br />
RT7A H2.5A 18 5 8d 5 8d -- -- -- -- 345 345 1235 1.53 1.53 5.49 295 295 1060 1.31 1.31 4.72<br />
RT7A-GC -- -- 18 5 N8-GC 5 N8-GC -- -- -- -- 345 345 1235 1.53 1.53 5.49 295 295 1060 1.31 1.31 4.72<br />
LFTA6 2 H6, TSP 16 8 8d 8 8d -- -- -- -- 870 -- -- 1265 3.87 -- -- 5.63 775 -- -- 1075 3.45 -- -- 4.78<br />
RT8A H8 18 5 10d x 1-1/2 5 10d x 1-1/2 -- -- -- -- 350 350 1430 1.56 1.56 6.36 300 300 1225 1.33 1.33 5.45<br />
RT10<br />
H2, H2A,<br />
S/H2<br />
18 6 8d 8 8d 6 8d 315 315 940 1.40 1.40 4.18 270 270 805 1.20 1.20 3.58<br />
RT15 H1 18 5 8d x 1-1/2 5 8d -- -- -- -- 925 485 975 4.11 2.16 4.34 795 415 835 3.54 1.85 3.71<br />
RT15-GC -- -- 18 5 N8-GC 5 N8-GC -- -- -- -- 910 475 960 4.05 2.11 4.27 770 400 805 3.43 1.78 3.58<br />
RT16A<br />
H10,<br />
H10A, 18 9 10d x 1-1/2 8 10d -- -- -- -- 1285 1195 2545 5.72 5.32 11.32 1100 1025 2180 4.89 4.56 9.70<br />
H14<br />
RT16AR H10AR 18 9 10d x 1-1/2 8 10d -- -- -- -- 1285 1195 2545 5.72 5.32 11.32 1100 1025 2180 4.89 4.56 9.70<br />
RT16-2 H10-2 18 8 8d 8 8d -- -- -- -- 1050 675 1860 4.67 3.00 8.27 900 580 1595 4.00 2.58 7.09<br />
HHCP2 HCP2 18 10 10d x 1-1/2 10 10d x 1-1/2 -- -- -- -- 710 -- -- 1505 3.16 -- -- 6.69 505 -- -- 1070 2.25 -- -- 4.76<br />
HHCP4-TZ HCP4, HCP4Z 16 8 10d 8 10d -- -- -- -- 690 -- -- 1835 3.07 -- -- 8.16 590 -- -- 1575 2.62 -- -- 7.01<br />
HC520 GBC 18 -- -- -- -- 11 8d 6 8d 510 560 640 2.27 2.49 2.85 440 485 555 1.96 2.16 2.47<br />
HCPRS -- -- 18 -- -- -- -- 5 8d 6 8d x 1-1/2 945 340 1020 4.20 1.51 4.54 665 240 660 2.96 1.07 2.94<br />
RT20 -- -- 16 9 10d x 1-1/2 4 10d 9 10d x 1-1/2 -- -- -- -- 1925 -- -- -- -- 8.56 -- -- -- -- 1650 -- -- -- -- 7.34<br />
1) 15% increase for short-term loads such as wind and earthquake has been taken into account for factored resistances, no further increase allowed.<br />
2) LFTA6: To achieve F1 lateral loads, three nails must be installed on each side on the strap located closest to the bend line.<br />
Lateral F1 load direction does not apply to roof truss-to-top plate installations.<br />
3) NAILS:<br />
red font.<br />
© Copyright 2013 <strong>USP</strong> Structural <strong>Connectors</strong> ®<br />
Anchor installation to achieve twice the load<br />
(using two identical connectors)<br />
Wall Top Plate<br />
Install diagonally across from each<br />
other for minimum 1-1/2˝ truss/rafter<br />
(Top View)<br />
Nailing into both sides of a single ply 2x<br />
truss/rafter may cause damages in the<br />
wood<br />
162<br />
1-800-328-5934 • www.<strong>USP</strong>connectors.com