25.12.2014 Views

EWP Hangers - USP Connectors

EWP Hangers - USP Connectors

EWP Hangers - USP Connectors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Moisture Barrier Plates – NOP series<br />

Moisture Barrier Plates protect the bottom chords<br />

of trusses from moisture damage caused by direct<br />

contact with concrete. These plates eliminate the<br />

need for more expensive treated wood plates.<br />

W<br />

L<br />

Truss & Rafter<br />

Materials: See chart<br />

Finish: G90 galvanizing<br />

Installation:<br />

• Use all specified fasteners. See Product Notes,<br />

page 10.<br />

• Pre-attach to truss bottom chord or rafter using<br />

prepunched prongs and/or 6d common nails to<br />

prevent wood-to-concrete contact.<br />

<strong>USP</strong><br />

Steel<br />

Dimensions Fastener Schedule 1,2<br />

Size Stock No. Ref. No. Gauge W L Qty Type<br />

NOP2X TSS2, TBP8 26 1-7/16 8 -- -- -- --<br />

2x<br />

NOP1 -- -- 22 1-1/2 8 2 6d<br />

4x NOP4 TSS2-2 26 3-1/2 8 2 6d<br />

1) Minimum nail embedment shall be 8 nail diameters (typ).<br />

2) NAILS<br />

W<br />

NOP1<br />

L<br />

NOP2X<br />

NOP4<br />

W<br />

Typical NOP4<br />

installation<br />

NOP4<br />

L<br />

© Copyright 2013 <strong>USP</strong> Structural <strong>Connectors</strong> ®<br />

Embedded Truss Anchors – LPTA<br />

Low profile design attaches to 2 x 4 or larger bottom chords and<br />

provides uplift and lateral load resistance.<br />

Materials: 18 gauge<br />

Finish: G90 galvanizing<br />

Codes: Load values are derived from data<br />

submitted to various North American<br />

building code evaluators.<br />

F 1<br />

Uplift<br />

F 2<br />

Installation:<br />

• Use all specified fasteners. See Product Notes, page 10.<br />

• Embed LPTA 4˝ into concrete tie beam or masonry bond<br />

beam.<br />

• Anchors should be spaced no closer than 8˝ centre-to-centre.<br />

• Moisture barrier may be required.<br />

Typical LPTA installation<br />

W<br />

Dimensions (in)<br />

Fastener Schedule<br />

Factored Resistance (115%) 1<br />

<strong>USP</strong><br />

Steel<br />

Min<br />

DF-L (Lbs) DF-L (kN) S-P-F (Lbs) S-P-F (kN)<br />

Stock No. Ref. No. Gauge W H Qty 2 Type 3,4 Uplift F1 F2 Uplift F1 F2 Uplift F1 F2 Uplift F1 F2<br />

LPTA LTA2 18 5 8-1/4 10 10d x 1-1/2 1555 1005 1865 6.92 4.47 8.30 1555 1005 1865 6.92 4.47 8.30<br />

1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; reduce for other<br />

load durations in accordance with the code.<br />

2) Minimum quantity of fasteners to be installed. Product may have additional nail holes not needed to meet<br />

published factored resistance of product.<br />

3) Minimum nail embedment shall be 8 nail diameters (typ).<br />

4) NAILS<br />

1 7 /16˝<br />

LPTA<br />

H<br />

1 3 /4˝<br />

152<br />

1-800-328-5934 • www.<strong>USP</strong>connectors.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!