<strong>BHEL</strong>-ISG<br />

GENERAL SPECIFICATION FOR<br />

PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />

WORKS OF CHP & AHP PACKAGE<br />

2X250 MW BARAUNI THERMAL POWER PROJECT<br />

SPECIAL CONDITIONS OF CONTRACT<br />

SPECIFICATION NO<br />

IS- 1-10-2013 / 005<br />

DATE: 04/06/2011<br />

Volume-1<br />

Section - 6<br />

DRAWING AND DOCUMENT<br />

The detailed drawings and documents shall be prepared by the<br />

successful contractor as per the specification, system requirement and<br />

the scope. These drawings and documents shall be submitted to<br />

<strong>BHEL</strong>/Customer/Customer's consultant for checking and approval.<br />

Approved drawings shall be released for construction. The contractor<br />

will also ensure availability of all drawings/documents at work place.<br />

Contractor shall ensure safe storage and quick retrieval of these<br />

documents.<br />

The contractor shall maintain a record of all drawings and documents<br />

available with him in a register as per format given by <strong>BHEL</strong> engineer.<br />

Contractor shall ensure use of pertinent drawings / detail documents<br />

and removal of obsolete ones from work place and return to <strong>BHEL</strong>.<br />

The data furnished in various annexure enclosed with this tender<br />

specification are only approximate and for guidance. However, the<br />

change in the design and in the quantity may occur as is usual in any<br />

such large scale of work.<br />

Should any error or ambiguity be discovered in the specification or<br />

information the contractor shall forthwith bring the same to the notice<br />

of <strong>BHEL</strong> before commencement of work. <strong>BHEL</strong>'s interpretation in such<br />

cases shall be final and binding on the contractor.<br />

Deviation from design dimensions should not exceed permissible limit.<br />

The contractor shall not correct or alter any dimension / details,<br />

without specific approval of <strong>BHEL</strong>.<br />

DELAY AND EXTENSION OF TIME<br />

If, in the opinion of the engineer, the work is delayed :<br />

a) by reason of abnormally bad weather, or<br />

b) by reason of serious loss or damage by fire, or<br />

c) by reason of civil commotion, local combination of workmen,<br />

strike or lockout, affecting any of the trades employed on the work, or<br />

ENQUIRY No.<br />

88/11/6010/AK<br />

REV. R0 PAGE 30 of 33