30.12.2014 Views

1 - BHEL - Industrial Systems Group

1 - BHEL - Industrial Systems Group

1 - BHEL - Industrial Systems Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>BHEL</strong>-ISG<br />

GENERAL SPECIFICATION FOR<br />

PILING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />

WORKS OF CHP & AHP PACKAGE<br />

2X250 MW BARAUNI THERMAL POWER PROJECT<br />

INSTRUCTION TO BIDDERS<br />

SPECIFICATION NO<br />

IS- 1-10-2013 / 005<br />

DATE: 04/06/2011<br />

VOLUME 1<br />

SECTION 3<br />

are based on the requirement of project.<br />

2.0 PERIOD OF CONSTRUCTION:-<br />

The completion of all “piling, Civil, Structural and Architectural<br />

works” for the “coal handling works and ash handling works” shall be<br />

as mentioned in the relevant clauses. Civil, Structural and<br />

architectural works shall be completed in time on priority basis and<br />

fronts shall be handed over to other agencies working for this<br />

project as per the L-2 network and instructions of <strong>BHEL</strong>.<br />

The successful bidder shall submit a bar chart within 7 days from<br />

the award of work considering the over all project completion<br />

schedule.<br />

3.0 PAYMENTS:-<br />

Payment shall be made based on the actual quantity of works done<br />

duly certified by the engineer in charge and as per terms of<br />

payment shown somewhere else in the tender document.<br />

The rates quoted by the bidder shall be deemed to include cost of<br />

engineering, design, approvals, material, equipment, fixtures,<br />

labour, construction plant, temporary works and everything<br />

whether of a permanent or temporary nature necessary for the<br />

completion of the job in all respects, all materials irrespective of<br />

whether it is mentioned in the item description or not. The bidder<br />

shall be deemed to have satisfied him-self before bidding to the<br />

correctness and sufficiency of their bid for the work and of the<br />

rates and prices quoted by them, which shall cover all their<br />

obligations under the contract necessary for successful completion<br />

and maintenance of work. No extra charges whatsoever<br />

consequent or any misinterpretation or otherwise shall be<br />

allowed.<br />

4.0 BIDDERS RESPONSIBILITY:-<br />

4.1 Bidders shall prepare the proposal in accordance with the conditions<br />

ENQUIRY No.<br />

88/11/6010/AK<br />

REV. R0 PAGE 5 of 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!