1 - BHEL - Industrial Systems Group
1 - BHEL - Industrial Systems Group
1 - BHEL - Industrial Systems Group
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>BHEL</strong>-ISG<br />
GENERAL SPECIFICATION FOR<br />
PILING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
INSTRUCTION TO BIDDERS<br />
SPECIFICATION NO<br />
IS- 1-10-2013 / 005<br />
DATE: 04/06/2011<br />
VOLUME 1<br />
SECTION 3<br />
are based on the requirement of project.<br />
2.0 PERIOD OF CONSTRUCTION:-<br />
The completion of all “piling, Civil, Structural and Architectural<br />
works” for the “coal handling works and ash handling works” shall be<br />
as mentioned in the relevant clauses. Civil, Structural and<br />
architectural works shall be completed in time on priority basis and<br />
fronts shall be handed over to other agencies working for this<br />
project as per the L-2 network and instructions of <strong>BHEL</strong>.<br />
The successful bidder shall submit a bar chart within 7 days from<br />
the award of work considering the over all project completion<br />
schedule.<br />
3.0 PAYMENTS:-<br />
Payment shall be made based on the actual quantity of works done<br />
duly certified by the engineer in charge and as per terms of<br />
payment shown somewhere else in the tender document.<br />
The rates quoted by the bidder shall be deemed to include cost of<br />
engineering, design, approvals, material, equipment, fixtures,<br />
labour, construction plant, temporary works and everything<br />
whether of a permanent or temporary nature necessary for the<br />
completion of the job in all respects, all materials irrespective of<br />
whether it is mentioned in the item description or not. The bidder<br />
shall be deemed to have satisfied him-self before bidding to the<br />
correctness and sufficiency of their bid for the work and of the<br />
rates and prices quoted by them, which shall cover all their<br />
obligations under the contract necessary for successful completion<br />
and maintenance of work. No extra charges whatsoever<br />
consequent or any misinterpretation or otherwise shall be<br />
allowed.<br />
4.0 BIDDERS RESPONSIBILITY:-<br />
4.1 Bidders shall prepare the proposal in accordance with the conditions<br />
ENQUIRY No.<br />
88/11/6010/AK<br />
REV. R0 PAGE 5 of 8