<strong>BHEL</strong>-ISG<br />

GENERAL SPECIFICATION FOR<br />

PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />

WORKS OF CHP & AHP PACKAGE<br />

2X250 MW BARAUNI THERMAL POWER PROJECT<br />

SPECIAL CONDITIONS OF CONTRACT<br />

SPECIFICATION NO<br />

IS- 1-10-2013 / 005<br />

DATE: 04/06/2011<br />

Volume-1<br />

Section - 6<br />

GENERAL<br />

The special conditions of contract and other contract documents are<br />

complimentary to each other and shall be read in conjunction with<br />

each other. In case of any confliction of meanings between the special<br />

conditions of contract and the <strong>BHEL</strong> GCC, provisions of special<br />

conditions of contract shall over ride the corresponding provisions of<br />

the <strong>BHEL</strong> GCC.<br />

GENERAL SCOPE OF WORK<br />

This tender specification for Pilling, Civil & structural steel works<br />

includes detailed design, engineering, construction , shop & field<br />

fabrication, inspection, storage and inplant transportation for all<br />

facilities of the inplant coal & ash handling system(design & detailing<br />

for AHP will be in <strong>BHEL</strong>/<strong>BHEL</strong> vendor scope) and handing over to<br />

employer as per the scope defined in Section -2, Volume-1.<br />

The detailed scope of work and the technical requirements for the<br />

work to be executed under this specification shall be as per the<br />

approved drawings, technical requirements enclosed in Vol-II<br />

The detail scope of work covered in the section 2 is not a<br />

comprehensive list of items of work involved. The detail scope of work<br />

may vary considerably depending on the actual requirements at site as<br />

per the requirements of the customer if any.<br />

ALSO INCLUDED IN THE SCOPE<br />

Unless otherwise specified, the work to be provided by the contractor<br />

for the items shall include but not be limited to the following:<br />

a) Furnishing all labour, materials, supervision, construction plans,<br />

equipment, supplies, transport to & from the site, fuel, electricity,<br />

compressed air, water, transit and storage insurance and all other<br />

incidental items and temporary works not shown on specified but<br />

ENQUIRY No.<br />

88/11/6010/AK<br />

REV. R0 PAGE 1 of 33