GENERAL SPECIFICATION FOR<br />
PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
SPECIAL CONDITIONS OF CONTRACT<br />
SPECIFICATION NO<br />
IS- 1-10-2013 / 005<br />
DATE: 04/06/2011<br />
Volume-1<br />
Section - 6<br />
A) In the event of discrepancies between description in words and<br />
figures quoted by a tenderer, the lesser of the two will be treated as<br />
valid rate.<br />
B)In the event of an error occurring in the amount column of schedule<br />
of quantities as a result of wrong extension of the unit rate and<br />
quantity, the unit rate shall be regarded as firm and extension shall be<br />
amended on the basis of the rate.<br />
C)All errors in totaling in the amount column and in carrying forward<br />
totals shall be corrected.<br />
D)The totals of various sections of bill of quantities amended shall be<br />
carried over to the general summary and the tendered sum amended<br />
accordingly. The tendered sum so altered shall, for the purpose of<br />
tender, be substituted for the sum originally tendered and considered<br />
for acceptance instead of the original sum quoted by the tenderer. Any<br />
rounding of quantities or in sections of bill of quantities or in general<br />
summary, by the tenderer, shall be ignored.<br />
E) If neither drawing nor specification contain any mention of minor<br />
details of construction which in the opinion of the engineer whose<br />
decision shall be final and conclusive, are reasonable and obviously<br />
and fairly intended for satisfactory completion of work, such details<br />
shall be provided by the contractor without any extra cost, as if they<br />
were specially mentioned and shall be deemed to be included in the<br />
drawings.<br />
Besides provision with regard to safety, contractor shall note that<br />
explosives shall not be used on the work by contractor except with<br />
permission in written the engineer and in manner and to the extent to<br />
the he has presented. Where explosives are used, the same shall be<br />
stored in a special magazine to be provided by and at the cost of the<br />
contractor who shall be liable for all damages, losses and injury to any<br />
person or property and shall be responsible for complying with all<br />
statutory obligations in this respect.<br />
The contractor will be responsible for health, safety and environment<br />
ENQUIRY No.<br />
88/11/6010/AK<br />
REV. R0 PAGE 19 of 33