1 - BHEL - Industrial Systems Group
1 - BHEL - Industrial Systems Group
1 - BHEL - Industrial Systems Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>BHEL</strong>-ISG<br />
GENERAL SPECIFICATION FOR<br />
PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
SPECIAL CONDITIONS OF CONTRACT<br />
SPECIFICATION NO<br />
IS- 1-10-2013 / 005<br />
DATE: 04/06/2011<br />
Volume-1<br />
Section - 6<br />
management at site for the construction activities to be carried out by<br />
them in accordance with requirements given in the tender document.<br />
Contractor shall arrange for following provisions of HSE (Health,<br />
Safety & Environment Policy):<br />
1. Contractor has to maintain contact with local hospital having<br />
scanning and other modern medical facilities required during<br />
emergency.<br />
2. Contractor has to ensure pre-employment medical check for all<br />
staff and workers.<br />
3. Contractor has to ensure that adequate first aid facilities with<br />
trained nurse and ambulance are available at work site for emergency<br />
purpose. This emergency set-up should include, but not limited to<br />
following :<br />
(i)Male Nurse (In shifts) (ii)Oxygen set up (iii) Breathing apparatus<br />
(iv) Eye wash facility (v) Stretcher (vi) Trauma blanket (vii) Medicines.<br />
The ambulance is required to be arranged and maintained at site and<br />
for entire contract period for subject work by the successful bidder.<br />
This emergency facility set up including ambulance, male nurse etc.<br />
will be shared by <strong>BHEL</strong> and its other contractors working at same<br />
project in case of an need at no extra cost to <strong>BHEL</strong> and its subcontractors.<br />
NUISANCE<br />
The contractor shall not at any time do, cause or permit any nuisance<br />
on site or do anything which shall cause unnecessary disturbance or<br />
inconvenience to owners, tenants or occupiers of other properties near<br />
the site and to the public generally.<br />
MATERAIL OBTAINED FROM EXCAVATION<br />
Materials of any kind obtained from excavation on the site shall<br />
ENQUIRY No.<br />
88/11/6010/AK<br />
REV. R0 PAGE 20 of 33