30.12.2014 Views

1 - BHEL - Industrial Systems Group

1 - BHEL - Industrial Systems Group

1 - BHEL - Industrial Systems Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>BHEL</strong>-ISG<br />

GENERAL SPECIFICATION FOR<br />

PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />

WORKS OF CHP & AHP PACKAGE<br />

2X250 MW BARAUNI THERMAL POWER PROJECT<br />

SPECIAL CONDITIONS OF CONTRACT<br />

SPECIFICATION NO<br />

IS- 1-10-2013 / 005<br />

DATE: 04/06/2011<br />

Volume-1<br />

Section - 6<br />

management at site for the construction activities to be carried out by<br />

them in accordance with requirements given in the tender document.<br />

Contractor shall arrange for following provisions of HSE (Health,<br />

Safety & Environment Policy):<br />

1. Contractor has to maintain contact with local hospital having<br />

scanning and other modern medical facilities required during<br />

emergency.<br />

2. Contractor has to ensure pre-employment medical check for all<br />

staff and workers.<br />

3. Contractor has to ensure that adequate first aid facilities with<br />

trained nurse and ambulance are available at work site for emergency<br />

purpose. This emergency set-up should include, but not limited to<br />

following :<br />

(i)Male Nurse (In shifts) (ii)Oxygen set up (iii) Breathing apparatus<br />

(iv) Eye wash facility (v) Stretcher (vi) Trauma blanket (vii) Medicines.<br />

The ambulance is required to be arranged and maintained at site and<br />

for entire contract period for subject work by the successful bidder.<br />

This emergency facility set up including ambulance, male nurse etc.<br />

will be shared by <strong>BHEL</strong> and its other contractors working at same<br />

project in case of an need at no extra cost to <strong>BHEL</strong> and its subcontractors.<br />

NUISANCE<br />

The contractor shall not at any time do, cause or permit any nuisance<br />

on site or do anything which shall cause unnecessary disturbance or<br />

inconvenience to owners, tenants or occupiers of other properties near<br />

the site and to the public generally.<br />

MATERAIL OBTAINED FROM EXCAVATION<br />

Materials of any kind obtained from excavation on the site shall<br />

ENQUIRY No.<br />

88/11/6010/AK<br />

REV. R0 PAGE 20 of 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!