<strong>BHEL</strong>-ISG<br />
GENERAL SPECIFICATION FOR<br />
PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
SPECIAL CONDITIONS OF CONTRACT<br />
SPECIFICATION NO<br />
IS- 1-10-2013 / 005<br />
DATE: 04/06/2011<br />
Volume-1<br />
Section - 6<br />
the contract for any materials supplied by the contractor other than<br />
those for which, as stated above, satisfactory proof has already been<br />
furnished, at the cost of the contractor and the contractor shall provide<br />
at his expense all facilities which the engineer may require for the<br />
purpose. If no tests are specified in the contract and such tests are<br />
required by the engineer, the contractor shall provide all facilities<br />
required for the purpose and the charges for these tests shall be borne<br />
by the contractor only.<br />
MATERIAL SUPPLY BY <strong>BHEL</strong> FREE OF COST<br />
The contractor shall at his own expenses provide all construction materials (including<br />
cement) required for the work.<br />
However <strong>BHEL</strong> will supply Structural steel & Reinforcement steel free of cost<br />
as per following terms & conditions:<br />
CHP<br />
All structural & reinforcement steel required for CHP shall be supplied by <strong>BHEL</strong> free<br />
of cost.<br />
AHP<br />
All structural & reinforcement steel required for AHP shall be supplied by <strong>BHEL</strong> free<br />
of cost.<br />
Materials will be issued only for building structures, permanent works<br />
and not for technological ( BAH alone) structures, for making<br />
templates, other temporary works, enabling works etc. and the same<br />
shall not be into account for purpose of material reconciliation.<br />
The contractor shall bear all other costs including the lifting, carting<br />
from issue points to works site/contractor's stores, custody and<br />
handling etc. and return of surplus/serviceable materials to owner's<br />
stores to be designated by the Engineer-in-charge and all expenditure<br />
will be made by the contractor.<br />
The structural steel and reinforcement steel shall be issued in<br />
available lengths / shapes on weight basis and cost of all<br />
straightening, cutting and jointing if any required shall be borne by<br />
ENQUIRY No.<br />