<strong>BHEL</strong>-ISG<br />
GENERAL SPECIFICATION FOR<br />
PILING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
INSTRUCTION TO BIDDERS<br />
SPECIFICATION NO<br />
IS- 1-10-2013 / 005<br />
DATE: 04/06/2011<br />
VOLUME 1<br />
SECTION 3<br />
included for these works.<br />
Contractors to make their own arrangements for labour camp etc.<br />
Any statutory requirement shall be followed without fail.<br />
4.5 Any material or service to be issued / rendered by the <strong>BHEL</strong> (unless<br />
specifically stipulated to be free of cost / cost recoverable basis) to<br />
the contractor, the same shall be made available along with 15%<br />
departmental charges over and above the cost. <strong>BHEL</strong> shall not be<br />
responsible for any delay due to this reason and delay shall be to<br />
contractors account.<br />
4.6 Minimum requirement of the equipment for civil works are listed in<br />
Volume-2, Section 10 in this document. These equipments shall be<br />
engaged without fail for the execution of the work. Price quoted<br />
includes providing these equipments.<br />
4.7 Quantities indicated in Bill of quantities are tentative and are<br />
likely to vary to any extent during detail engineering and as per<br />
site condition.<br />
4.8 Contractor shall establish a full fledge batching plant at site<br />
exclusively for the work covered under this contract.<br />
4.9 Detail specifications of the item are given in the technical section of<br />
the tender. In case detail specification for a certain item is not<br />
available in tender doc, specifications as per IS (Latest edition) and<br />
CPWD shall be followed. However in case the detail specification for<br />
that item is not available in IS (Latest edition) and CPWD<br />
specification, then the specification fixed by <strong>BHEL</strong> shall be followed.<br />
No additional commercial implication in any case shall be admitted.<br />
4.10 Quality assurance plan shall be submitted for the approval of <strong>BHEL</strong><br />
and GSECL. The approved plan shall be strictly followed without fail.<br />
Site facilities for day - to - day quality check shall be provided. All<br />
the expenses in assuring quality shall be to the account of contractor<br />
and <strong>BHEL</strong> shall make no extra payment on account of this. This<br />
expenditure is deemed to have been included in the rates quoted.<br />
ENQUIRY No.<br />
88/11/6010/AK<br />
REV. R0 PAGE 7 of 8