<strong>BHEL</strong>-ISG<br />
GENERAL SPECIFICATION FOR<br />
PILING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
SPECIFICATION NO<br />
IS- 1-10-2013 /005<br />
DATE:04/06/2011<br />
PROJECT SYNOPSIS VOLUME 1/<br />
SECTION 1<br />
PROJECT SYNOPSIS<br />
1.0<br />
GENERAL PROJECT INFORMATION:<br />
Bihar State Electricity Board (BSEB) is setting up a Coal fired<br />
Thermal Power plant at Barauni, Begusarai District, Bihar. The<br />
capacity of the proposed thermal power project is 500MW with 2 x<br />
250 MW configurations with sub – critical steam parameters. The<br />
power generated from the plant will be sold to BIHAR as well as to<br />
other states through interstate transmission system. <strong>BHEL</strong> is the<br />
EPC contractor for the above plant and M/s BSEB has appointed<br />
M/S EVONIC as the owner’s consultant for the project.<br />
1.1<br />
Site /Ambient condition<br />
Longitude / latitude<br />
Average elevation Mean<br />
Sea Level<br />
Maximum Monthly average<br />
temperature<br />
Minimum<br />
temperature<br />
monthly<br />
-<br />
-<br />
86 0 01’36”E /<br />
25 0 23’36”N<br />
RL (+) 45.3m<br />
(approximately) for<br />
main plant block.<br />
- 42.4 deg C<br />
- 8.4 Deg C<br />
Maximum relative Humidity - 81 %<br />
Minimum Relative Humidity - 43 %<br />
Design relative Humidity - 80 %<br />
Annual Maximum Wind<br />
speed<br />
- 17 m/ sec<br />
Average Annual rainfall - 1119.1mm<br />
Maximum rainfall in 24 hrs - 352.8mm<br />
ENQUIRY No<br />
88/11/6010/AK<br />
REV. R0 PAGE 1 of 3