1 - BHEL - Industrial Systems Group
1 - BHEL - Industrial Systems Group
1 - BHEL - Industrial Systems Group
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>BHEL</strong>-ISG<br />
GENERAL SPECIFICATION FOR<br />
PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
SPECIAL CONDITIONS OF CONTRACT<br />
SPECIFICATION NO<br />
IS- 1-10-2013 / 005<br />
DATE: 04/06/2011<br />
Volume-1<br />
Section - 6<br />
contract.<br />
b) Extra item/ new items of work<br />
c) Quantities in excess of those provided in the contract schedule.<br />
d) Items in respect of which rates have not been settled.<br />
MEATHOD OF MEASUREMENT<br />
Method of measurements shall be as per standard specifications<br />
included in the tender. For other items measurements shall be as<br />
per relevant IS codes.<br />
COMPLIANCE TO REGULATIONS AND BYELAWS:<br />
The contractor shall conform to the provisions of any statute<br />
relating to the work and regulations and bylaws of any local<br />
authority and of any water and lighting companies or undertaking<br />
with whose system the work is proposed to be connected. He<br />
shall, before making any variation from the drawings or the<br />
specifications that may be necessitated for such connections give<br />
the engineer, notice specifying the variation proposed to be<br />
made and the reasons therefore and shall not carryout any<br />
variation until he has received instructions from the engineer in<br />
respect thereof. The contractor shall be bound to give all notices<br />
required by statute, regulations or bye-laws as aforesaid and to<br />
pay all fees and taxes payable to any authority in respect<br />
thereof.<br />
FACILITES TO BE PROVIDED BY THE <strong>BHEL</strong>/ CONTRACTOR<br />
<strong>BHEL</strong> shall provide free of charge limited open space, for office<br />
and storage shed, as and where made available by M/s GSECL. It<br />
is the responsibility of the contractor to construct sheds, provide<br />
all utilities and dismantle and clear the site after completion of<br />
work or as and when required, as a part of his scope of work.<br />
ENQUIRY No.<br />
88/11/6010/AK<br />
REV. R0 PAGE 25 of 33