<strong>BHEL</strong>-ISG<br />
GENERAL SPECIFICATION FOR<br />
PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
SPECIAL CONDITIONS OF CONTRACT<br />
SPECIFICATION NO<br />
IS- 1-10-2013 / 005<br />
DATE: 04/06/2011<br />
Volume-1<br />
Section - 6<br />
The contractor, in the event of this work awarded to him, shall<br />
establish an office at site and keep posted an authorized, responsible<br />
officer with valid Power of Attorney for the purpose of the contract.<br />
Any order or instructions of the engineer or his duly authorized<br />
representative, communicated to the contractor's representative at<br />
site office will be deemed to have been communicated to the<br />
contractor at his legal address.<br />
SITE FACILITIES<br />
LAND<br />
<strong>BHEL</strong> shall allot land to the contractor if customer GSECL allots the<br />
same to <strong>BHEL</strong> for his office & stores. Contractor must maintain the<br />
areas allotted to him in a neat and clean condition as required by the<br />
Employer. The contractor shall provide adequate storage, testing and<br />
office facilities with approval from the engineer. The rate quoted by<br />
the contractor shall be deemed to include for these and no separate<br />
payment will be made towards these.<br />
On completion of work, the site shall be cleaned by the contactor of all<br />
materials, temporary sheds, debris, rubbish plants and equipments,<br />
belonging to the contractor at no extra cost. The site and surroundings<br />
shall be handed over in neat and clean conditions. Periodical house<br />
keeping shall be done by contractor as per the instructions of <strong>BHEL</strong><br />
and GSECL at no extra cost. In case of any failure by the contractor,<br />
the employer will get set at risk and cost of the contractor.<br />
SUPPLY OF POWER, WATER, ETC.<br />
Construction power and construction water shall be supplied free of cost.<br />
However this shall not be binding on <strong>BHEL</strong> / Customer. In case <strong>BHEL</strong> /<br />
Customer are unable to supply due to any reasons, contractor shall<br />
arrange Construction power and construction water on his own.<br />
However both construction power & water is supplied at one point within<br />
the thermal power plant boundary. Successful contractor of <strong>BHEL</strong> shall<br />
arrange by suitable means to tap the same. All the safety precautions shall<br />
ENQUIRY No.<br />
88/11/6010/AK<br />
REV. R0 PAGE 4 of 33