1 - BHEL - Industrial Systems Group
1 - BHEL - Industrial Systems Group
1 - BHEL - Industrial Systems Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>BHEL</strong>-ISG<br />
GENERAL SPECIFICATION FOR<br />
PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
SPECIAL CONDITIONS OF CONTRACT<br />
SPECIFICATION NO<br />
IS- 1-10-2013 / 005<br />
DATE: 04/06/2011<br />
Volume-1<br />
Section - 6<br />
open for supervision and verification by the Engineer-in-charge or his<br />
authorized representative by any time when the Engineer-in-charge<br />
feels the need to do so.<br />
In the case of steel materials, the same shall be supplied generally on<br />
the basis of weight and will be calculated as per Indian standard. For<br />
the purpose of billing and accounting, only linear measurement<br />
multiplied by the standard unit weight will be considered and the<br />
difference between the measured weight and actual weight shall be to<br />
contractor's account. Quoted price shall be deemed to include the<br />
above. No claim whatsoever shall be entertained on account of<br />
wastage and difference in weight as referred to above.<br />
The contractor shall bear all incidental costs including site lifting,<br />
carting from Issue points to site / contractor's store, custody and<br />
handling etc.,<br />
The contractor will have to submit their design mix for different grades<br />
of concrete keeping in view the requirements stipulated in 1S-456. The<br />
minimum cement content for various grades of concrete shall be as<br />
specified in the design memorandum/ design basis report.<br />
The contractor shall indemnify <strong>BHEL</strong>, its representatives or employees<br />
against any action, claim or proceeding relating to infringement or use<br />
of any patent or design or any alleged patent or design rights and shall<br />
pay any royalties or other charges which may be payable in respect of<br />
any article or material or part thereof included in the contract. In the<br />
event of any claim being made or action being brought against <strong>BHEL</strong><br />
or any agent, servant or employee of <strong>BHEL</strong> in respect of any such<br />
matters as aforesaid, the contractor shall immediately be notified<br />
thereof, provided that such indemnity shall not apply when such<br />
infringement has taken place in complying with the specific directions<br />
issued by <strong>BHEL</strong> but the contractor shall pay any royalties or other<br />
charges payable in respect of any such use, the amount so paid being<br />
reimbursed to the contractor only if the use was the result of any<br />
drawings and / or specifications issued after submission of the tender.<br />
The engineer shall be entitled to have tests carried out as specified in<br />
ENQUIRY No.<br />
88/11/6010/AK<br />
REV. R0 PAGE 12 of 33