<strong>BHEL</strong>-ISG<br />

GENERAL SPECIFICATION FOR<br />

PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />

WORKS OF CHP & AHP PACKAGE<br />

2X250 MW BARAUNI THERMAL POWER PROJECT<br />

SPECIAL CONDITIONS OF CONTRACT<br />

SPECIFICATION NO<br />

IS- 1-10-2013 / 005<br />

DATE: 04/06/2011<br />

Volume-1<br />

Section - 6<br />

RECORD FOR MATERIALS CONSUMED<br />

The contractor shall maintain and furnish to the engineer the record of<br />

materials consumed in the works for each activity. The statement<br />

showing the theoretical vis-a-vis actual consumption of specified<br />

materials, such as structural steel, grouting compound, paint etc. shall<br />

be enclosed along with the running bills submitted by the contractor.<br />

Contractor has to also furnish the test results of the materials used in<br />

the work as per IS specifications.<br />

PROTECTION OF EMBEDMENTS, BOLTS ETC<br />

The contractor shall ensure proper protection to the satisfaction of the<br />

engineer, of all bolts, inserts, embedment etc. from weather etc. by<br />

greasing, rapping them with gunny bags or canvas or by any other<br />

means as directed by engineer. Cost of such protections shall be<br />

deemed to be included in the rates quoted for the item.<br />

CLEARANCE OF SITE AND REPAIRS<br />

Contractor has to clear the site/area where mechanical and electrical<br />

erection work is to be commenced or in progress. The contractor shall<br />

remove construction materials and equipment lying in the vicinity and<br />

causing obstruction in the erection work within 24 hrs. notice. In case,<br />

he fails to clear the site, this will be done at his risk and cost by <strong>BHEL</strong>.<br />

QUALITY ASSURANCE<br />

The contractor shall submit the following quality document for approval<br />

of <strong>BHEL</strong> and its client.<br />

1. Quality plan for civil and structural works.<br />

2. Welding procedure<br />

3. Quality plan for painting work<br />

4. Quality plan for sheeting work<br />

ENQUIRY No.<br />

88/11/6010/AK<br />

REV. R0 PAGE 22 of 33