<strong>BHEL</strong>-ISG<br />
GENERAL SPECIFICATION FOR<br />
PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />
WORKS OF CHP & AHP PACKAGE<br />
2X250 MW BARAUNI THERMAL POWER PROJECT<br />
SPECIAL CONDITIONS OF CONTRACT<br />
SPECIFICATION NO<br />
IS- 1-10-2013 / 005<br />
DATE: 04/06/2011<br />
Volume-1<br />
Section - 6<br />
be followed in taping the same. Consumption meter shall be established to<br />
meter the consumption. The power and water so issued shall not be<br />
misused.<br />
However due to some reason Contractor is not been able to supply<br />
construction power and water the same shall be arranged by bidder at his<br />
own cost. No additional commercial implication is applicable. Such charges<br />
are deemed to have been included in the offer. No separate payment is<br />
admitted.<br />
MACHINERY<br />
The contractor shall at his own expenses supply all tools, plant and<br />
equipment (herein after referred to as T&P) required for the execution of<br />
contract.<br />
CONTRACTOR’S SUPERVISION<br />
The contractor shall either himself supervise the execution of the contract<br />
or shall appoint a competent engineer / agent approved by the engineer to<br />
act in his stead.<br />
The contractor shall employ required number of engineers and site staff for<br />
executing the above work. A list of minimum manpower proposed to be<br />
deployed shall be enclosed in this offer.<br />
If the contractor fails to appoint a suitable engineers/ manpower as<br />
aforesaid, the engineer shall have full powers to suspend the execution of<br />
work and stop payment of any money that may have become due until<br />
such date as a suitable engineers/ manpower is appointed and the<br />
contractor shall be held responsible for the delay caused to the work<br />
and no extension of time on this account shall be given to him.<br />
Orders given to the contractor's engineers shall be considered to have<br />
the same force as if they had been given to the contractor himself.<br />
The contractor or his authorized site in charge shall be in attendance<br />
at the site during all working hours and shall superintend the<br />
ENQUIRY No.<br />
88/11/6010/AK<br />
REV. R0 PAGE 5 of 33