<strong>BHEL</strong>-ISG<br />

GENERAL SPECIFICATION FOR<br />

PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />

WORKS OF CHP & AHP PACKAGE<br />

2X250 MW BARAUNI THERMAL POWER PROJECT<br />

SPECIAL CONDITIONS OF CONTRACT<br />

SPECIFICATION NO<br />

IS- 1-10-2013 / 005<br />

DATE: 04/06/2011<br />

Volume-1<br />

Section - 6<br />

be followed in taping the same. Consumption meter shall be established to<br />

meter the consumption. The power and water so issued shall not be<br />

misused.<br />

However due to some reason Contractor is not been able to supply<br />

construction power and water the same shall be arranged by bidder at his<br />

own cost. No additional commercial implication is applicable. Such charges<br />

are deemed to have been included in the offer. No separate payment is<br />

admitted.<br />

MACHINERY<br />

The contractor shall at his own expenses supply all tools, plant and<br />

equipment (herein after referred to as T&P) required for the execution of<br />

contract.<br />

CONTRACTOR’S SUPERVISION<br />

The contractor shall either himself supervise the execution of the contract<br />

or shall appoint a competent engineer / agent approved by the engineer to<br />

act in his stead.<br />

The contractor shall employ required number of engineers and site staff for<br />

executing the above work. A list of minimum manpower proposed to be<br />

deployed shall be enclosed in this offer.<br />

If the contractor fails to appoint a suitable engineers/ manpower as<br />

aforesaid, the engineer shall have full powers to suspend the execution of<br />

work and stop payment of any money that may have become due until<br />

such date as a suitable engineers/ manpower is appointed and the<br />

contractor shall be held responsible for the delay caused to the work<br />

and no extension of time on this account shall be given to him.<br />

Orders given to the contractor's engineers shall be considered to have<br />

the same force as if they had been given to the contractor himself.<br />

The contractor or his authorized site in charge shall be in attendance<br />

at the site during all working hours and shall superintend the<br />

ENQUIRY No.<br />

88/11/6010/AK<br />

REV. R0 PAGE 5 of 33