30.12.2014 Views

1 - BHEL - Industrial Systems Group

1 - BHEL - Industrial Systems Group

1 - BHEL - Industrial Systems Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>BHEL</strong>-ISG<br />

GENERAL SPECIFICATION FOR<br />

PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />

WORKS OF CHP & AHP PACKAGE<br />

2X250 MW BARAUNI THERMAL POWER PROJECT<br />

SPECIAL CONDITIONS OF CONTRACT<br />

SPECIFICATION NO<br />

IS- 1-10-2013 / 005<br />

DATE: 04/06/2011<br />

Volume-1<br />

Section - 6<br />

TOOLS AND PLANTS AND MACHINERY<br />

Providing of required Tools and plants and machinery for executing<br />

the subject work is the responsibility of Contractor. Minimum<br />

requirement of tools and plants and machinery shall be indicated in<br />

the offer.<br />

In the event of failure of contractor to bring necessary and sufficient<br />

T&Ps & Machinery, <strong>BHEL</strong> will be at liberty to arrange the same at the<br />

risk and cost of contractor including transportation cost of same from<br />

any of <strong>BHEL</strong> site/place and hire charges as applicable shall be<br />

deducted from contractor's bill. Decision of <strong>BHEL</strong> in this regard shall<br />

be final and binding on contractor.<br />

All distribution boards, connecting cables/welding cables, wire ropes,<br />

hoses etc., including temporary air/water/electrical connectors etc.<br />

shall have to be arranged by the contractor at his own cost.<br />

The contractor shall engage trained and experienced operators for the<br />

operation of T&P's and machinery. <strong>BHEL</strong> engineer will check their skill<br />

and performance before they are allowed to operate the same.<br />

However, checking of skills by <strong>BHEL</strong> does not absolve the contractor of<br />

his responsibilities for proper and safe handling of equipment,<br />

consistent good performance of operators and regular performance<br />

evaluation of operators.<br />

The day to day and routine maintenance of T&Ps and machinery<br />

should be carried out by contractor and these shall be maintained in<br />

good working condition during the entire period of use T&Ps in<br />

defective/damaged condition shall be rectified promptly to the full<br />

satisfaction of <strong>BHEL</strong> engineer. Contractor shall maintain records for<br />

maintenance of major T&Ps which shall be made available for<br />

inspection whenever required. In case of any lapses on the part of the<br />

contractor, <strong>BHEL</strong> at its own discretion get the servicing/repair of<br />

equipment done at the risk and cost of the contractor with <strong>BHEL</strong><br />

overheads as applicable time to time.<br />

The contractor shall arrange all spares needed for upkeep of all T&Ps<br />

ENQUIRY No.<br />

88/11/6010/AK<br />

REV. R0 PAGE 8 of 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!