<strong>BHEL</strong>-ISG<br />

GENERAL SPECIFICATION FOR<br />

PILING, CIVIL, STRUCTURAL & ARCHITECTURAL<br />

WORKS OF CHP & AHP PACKAGE<br />

2X250 MW BARAUNI THERMAL POWER PROJECT<br />

SPECIFICATION NO:<br />

IS-1-10-2013/ 005<br />

DATE :04/06/2011<br />

LIST OF EQUIPMENTS Volume 1/<br />

Section 8<br />

38 Spring balance 2 Nos.<br />

39 Electric Winches 2 Nos.<br />

40 Spray painting equipments 1<br />

41 Paint thickness measuring instrument 1 No.<br />

42 Drilling machine as required<br />

43 Safety net as required<br />

44 Steel tapes & measuring device as required<br />

45 Safety devices for usage at work site as required<br />

46 Portable fire extinguisher as required<br />

47 Noise level indicator 1 No.<br />

48 Air quality monitoring instruments 1 No.<br />

49 Walkie & talkie 3 No.<br />

50 Emergency medical aid kits 1 Nos.<br />

51<br />

52<br />

Portable insulated metal site office (cabin) of minimum<br />

size 35m length,5 m width,3m height with required<br />

furniture, lighting, ventilation and air conditioned<br />

space and with required doors and windows<br />

aluminium fittings etc.<br />

Portable insulated metal/plastic (sintex or approved<br />

equivalent) toilet of size 5m length,3m width,3m<br />

height with required sanitary fittings<br />

1 No.<br />

1 No.<br />

53 PVC (sintex or approved equivalent) water tank of<br />

2 Nos.<br />

3000 litres capacity<br />

54 All other equipments, instruments, tools etc. as required<br />

ENQUIRY No.<br />

88/11/6010/AK<br />

REV. R0 PAGE 3 of 7