11.01.2015 Views

Integrated Planning and Reporting Manual - Division of Local ...

Integrated Planning and Reporting Manual - Division of Local ...

Integrated Planning and Reporting Manual - Division of Local ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTENTS<br />

INTRODUCTION<br />

<strong>Planning</strong> requirements at a glance 6<br />

<strong>Reporting</strong> requirements at a glance 7<br />

Introduction 8<br />

A new approach to planning <strong>and</strong> reporting 8<br />

1.1 Getting the most from the new planning <strong>and</strong> reporting framework 11<br />

1.2 Timeframes <strong>and</strong> sequencing 12<br />

1.3 Roles <strong>and</strong> responsibilities 14<br />

THE COMMUNITY STRATEGIC PLAN<br />

2.1 The Community Strategic Plan 18<br />

2.2 Deciding on timeframes 20<br />

2.3 Getting started 21<br />

2.4 Agreeing on principles 23<br />

2.5 The four key areas – addressing the quadruple bottom line 25<br />

2.6 Identifying the big issues - relevant information <strong>and</strong> research 28<br />

2.7 Engaging the Community 36<br />

2.8 Building the Plan 42<br />

2.9 Setting objectives 44<br />

2.10 Developing strategies 45<br />

2.11 Connecting with the LEP <strong>and</strong> other l<strong>and</strong> use planning mechanisms 47<br />

2.12 Deciding on assessment methods 49<br />

2.13 Reviewing the Plan 55<br />

2.14 Submitting the plan 57<br />

THE RESOURCING STRATEGY<br />

3.1 General Requirements 59<br />

3.2 Long Term Financial <strong>Planning</strong> 60<br />

3.2.1 Foundations <strong>of</strong> the Plan 61<br />

3.2.2 Risk assessment 64<br />

3.2.3 Financial modelling 64<br />

3.2.4 Performance monitoring 65<br />

3.3 Workforce Management <strong>Planning</strong> 66<br />

3.4 Asset Management <strong>Planning</strong> 67<br />

3.4.1 Asset Management Strategy 69<br />

3.4.2 Asset Management Plans 74<br />

3.4.3 <strong>Reporting</strong> 84<br />

THE DELIVERY PROGRAM<br />

4.1 General requirements 86<br />

4.2 Single point <strong>of</strong> reference 87<br />

4.3 Deciding on structure 88<br />

4.4 Linking strategic objectives <strong>and</strong> operational matters 89<br />

4.5 Linking with the resourcing strategy 93<br />

4.6 Allocating responsibilities 94<br />

4.7 Determining assessment methods 96<br />

4.8 Community comment 97<br />

4.9 Monitoring progress 98<br />

4.10 Reviewing the Program 99<br />

<strong>Planning</strong> & <strong>Reporting</strong> <strong>Manual</strong> Page 3 <strong>of</strong> 115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!