14.11.2012 Views

STARTING GUIDE FRENIC-Eco . FRN-F1 - Welcome to Fuji Electric

STARTING GUIDE FRENIC-Eco . FRN-F1 - Welcome to Fuji Electric

STARTING GUIDE FRENIC-Eco . FRN-F1 - Welcome to Fuji Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

J codes: Application functions<br />

Code Name Data setting range Default setting Actual setting<br />

J01 PID control Mode selection 0: Disable<br />

1: Enable (normal operation)<br />

2: Enable (inverse operation)<br />

J02 Remote process command 0: Enable arrow keys on keypad<br />

1: PID process command 1<br />

3: Enable terminal command UP/DOWN control<br />

4: Command via communications link<br />

J03<br />

P (gain) 0.000 <strong>to</strong> 30.000<br />

J04<br />

J05<br />

J06<br />

J10<br />

J11<br />

J12<br />

J13<br />

I (integral time) 0.0 <strong>to</strong> 3600.0 s<br />

D (differential time) 0.00 <strong>to</strong> 600.00 s<br />

Feedback filter 0.0 <strong>to</strong> 900.0 s<br />

Anti reset windup 0 <strong>to</strong> 200 %<br />

Select alarm output (Refer <strong>to</strong> <strong>FRENIC</strong>-<strong>Eco</strong> user's manual)<br />

Upper limit alarm (AH) 0 <strong>to</strong> 100 %<br />

Lower limit alarm (AL) 0 <strong>to</strong> 100 %<br />

J15 S<strong>to</strong>p frequency for slow flowrate 0: Disable<br />

1 <strong>to</strong> 120 Hz<br />

J16<br />

Slow flowrate level s<strong>to</strong>p latency 1 <strong>to</strong> 60 s<br />

J17 Starting frequency 0: Disable<br />

1 <strong>to</strong> 120 Hz<br />

J18 Upper limit of PID process output 1 <strong>to</strong> 120 Hz<br />

999: Depends on setting of <strong>F1</strong>5<br />

J19<br />

Lower limit of PID process output 1 <strong>to</strong> 120 Hz<br />

999: Depends on setting of <strong>F1</strong>6<br />

J21 Dew condensation prevention (Duty) 1 <strong>to</strong> 50 %<br />

J22 Commercial power switching sequence 0: Keep inverter operation (S<strong>to</strong>p due <strong>to</strong> alarm)<br />

1: Au<strong>to</strong>matically switch <strong>to</strong> commercial-power operation<br />

J23 Starting from the Slow Flowrate S<strong>to</strong>p<br />

(Feedback deviation level)<br />

0 <strong>to</strong> 100 %<br />

J24 Starting from the Slow Flowrate S<strong>to</strong>p<br />

(Start latency)<br />

0 <strong>to</strong> 60 s<br />

J25 Pump control Mode selection 0: Disable<br />

1: Enable (Fixed inverter-driven mo<strong>to</strong>r)<br />

2: Enable (Floating inverter-driven mo<strong>to</strong>r)<br />

J26 Mo<strong>to</strong>r 1 mode<br />

0: Disable (Always OFF)<br />

1: Enable<br />

J27 Mo<strong>to</strong>r 2 mode<br />

2: Force <strong>to</strong> run by commercial power<br />

J28<br />

J29<br />

Mo<strong>to</strong>r 3 mode<br />

Mo<strong>to</strong>r 4 mode<br />

J30 Mo<strong>to</strong>r switching order 0: Fixed<br />

1: Au<strong>to</strong>matically (Constant run time)<br />

J31 Mo<strong>to</strong>r s<strong>to</strong>p mode 0: S<strong>to</strong>p all mo<strong>to</strong>rs (inverter-driven and commercial power-driven)<br />

1: S<strong>to</strong>p inverter-driven mo<strong>to</strong>r only (excl. alarm state)<br />

2: S<strong>to</strong>p inverter-driven mo<strong>to</strong>r only (incl. alarm state)<br />

J32 Periodic switching time for mo<strong>to</strong>r drive 0.0: Disable switching<br />

0.1 <strong>to</strong> 720.0 h: Switching time range<br />

999: Fix <strong>to</strong> 3 min<br />

J33 Periodic switching signaling period 0.00 <strong>to</strong> 600.00 s<br />

J34 Sequenced start of commercial power- Frequency 0 <strong>to</strong> 120 Hz<br />

driven mo<strong>to</strong>r<br />

999: Depends on setting of J18<br />

(This code is used <strong>to</strong> judge whether or not <strong>to</strong> start a commercial<br />

power-driven mo<strong>to</strong>r by checking the output frequency of the<br />

inverter-driven mo<strong>to</strong>r)<br />

J35<br />

Duration 0.00 <strong>to</strong> 3600 s<br />

J36 Sequenced s<strong>to</strong>p of commercial power- Frequency 0 <strong>to</strong> 120 Hz<br />

driven mo<strong>to</strong>r<br />

999: Depends on setting of J19<br />

(This code is used <strong>to</strong> judge whether or not <strong>to</strong> s<strong>to</strong>p a commercial<br />

power-driven mo<strong>to</strong>r by checking the output frequency of the<br />

inverter-driven mo<strong>to</strong>r)<br />

J37<br />

Duration 0.00 <strong>to</strong> 3600 s<br />

J38<br />

J39<br />

Contac<strong>to</strong>r delay time 0.01 <strong>to</strong> 2.00 s<br />

Switching time for mo<strong>to</strong>r sequenced start (Deceleration<br />

time)<br />

0.00: Depends on the setting of F08<br />

0.01 <strong>to</strong> 3600 s<br />

Chapter 6: Function codes and application example 22<br />

0<br />

0<br />

0.100 times<br />

0.0 s<br />

0.00 s<br />

0.5 s<br />

200 %<br />

0<br />

100 %<br />

0 %<br />

0<br />

30 s<br />

0<br />

999<br />

999<br />

1 %<br />

0<br />

0 %<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0.0 h<br />

0.10 s<br />

999<br />

0.00 s<br />

999<br />

0.00 s<br />

0.10 s<br />

0.00 s

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!