Transitway Conversion<br />

• Conversion of the Transitway<br />

– In open areas, ballast and track will be installed on top of the<br />

existing roadway<br />

– Track through the stations will be directly fixed to a concrete<br />

slab for ease of maintenance<br />

– Minor changes to drainage will be required<br />

– Some structures will require modifications to increase vertical<br />

clearances<br />

• Once a section is converted it is unlikely that buses (or<br />

other vehicles) will operate along that section<br />

Construction Staging<br />

• Staging g will be determined by the successful contractors,<br />

but will follow these principles:<br />

– The tunnel and underground stations will likely start first, as<br />

these elements take the longest to construct<br />

– The Maintenance and Storage Facility must be completed<br />

midway through the construction of the project to allow for<br />

vehicle delivery and testing<br />

– Major work at Bayview, Hurdman and Blair is off the existing<br />

Transitway and can be done with minimal disruption to bus<br />

service<br />

– Conversion of the Transitway will be done in logical segments to<br />

maintain bus service on the Transitway for as long as possible<br />

Construction Staging<br />

• The project will be staged to:<br />

– Minimize construction cost,<br />

– Minimize traffic and bus service disruption,<br />

– Optimize cash flow, and<br />

– Maximize contractor efficiency<br />

• Once construction starts in an area, bus service will be<br />

rerouted<br />

• After construction is complete there will be a 6-8 month<br />

period for station fit-out, testing and commissioning<br />

before revenue service starts<br />

Rail Operations<br />

• Track, ,power and systems installation at the<br />

Maintenance and Storage Facility will be completed<br />

before the vehicles arrive<br />

• Testing in the yard and sections of the line close to the<br />

Maintenance and Storage Facility will begin as soon as<br />

possible<br />

• Each section of track that is completed will require a<br />

testing and commissioning period<br />

• Crossovers will be provided d at the terminus stations ti and<br />

at key points along the line to allow trains to reverse<br />

direction