Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line
Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line
Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Speaker Comment/Question Responded By Response<br />
have to be taken out and replaced by Scott<br />
Street and the Parkway, and I can’t see<br />
those facilities having the capacity for 3<br />
times as many buses that use the<br />
transitway and that sort of thing. I’m just<br />
wondering couldn’t there be a little bit<br />
more, even though you are going to hire<br />
the consultants on what to do next,<br />
couldn’t there be a little bit more or in<br />
showing what the build outs are from the<br />
stations that you are designing in<br />
particularly in the end points, Blair,<br />
Bayview perhaps because you didn’t<br />
actually show what the potentials would be<br />
for going north and we do know that the<br />
west corridor study might even chose the<br />
Carling corridor as an option for going<br />
west rather than the Parkway or the<br />
Richmond corridor, so isn’t it possible to<br />
just show what those might look like in a<br />
little more detail in this functional stage?