Federal EA Requirements<br />
• A federal EA is required under the Canadian<br />
Environmental Assessment Act when a federal authority:<br />
– Proposes a project;<br />
– Provides financial assistance to a proponent to enable<br />
a project to be carried out;<br />
– Sells, leases, or otherwise transfers control or<br />
administration of federal land to enable a project to<br />
be carried out; or<br />
– Provides a licence, permit or an approval that is listed<br />
in the Law List Regulations that enables a project to<br />
be carried out.<br />
Provincial EA Requirements<br />
• The EA for the DOTT project will follow Ontario Regulation<br />
231/08, Transit Projects and Greater Toronto o o Authority<br />
Undertakings (2008)<br />
• Major features of the Transit Project Assessment Process<br />
include:<br />
– Proponents can rely on previous planning work for project justification<br />
– EA completed within 6 months including public consultation period<br />
– Environmental Project Report (EPR) report prepared for a 30-day public<br />
and agency comment/objection period<br />
– After review period, Minister of the Environment has 35 days to issue<br />
decision<br />
– Issues of provincial importance or constitutionally protected Aboriginal<br />
or treaty rights are only grounds for objection to the project<br />
– ‘Time-out’ initiated until the concerns raised are addressed<br />
Environmental Effects and Mitigation<br />
• EA study assesses the potential environmental effects and benefits<br />
of a project on the environment (human, natural)<br />
– Effects at all stages of project implementation considered:<br />
• Planning/Design<br />
• Construction<br />
• Operation<br />
• Environmental effects have been avoided or minimized to the extent<br />
possible in the development of the DOTT project<br />
– Re-use of existing corridor<br />
– Identification and evaluation of alternatives<br />
– Selection of Recommended d Plan<br />
• Mitigation measures for effects that cannot be fully avoided will be<br />
developed<br />
Project Benefits<br />
• The DOTT project represents a significant transit<br />
investment for <strong>Ottawa</strong> and will benefit residents,<br />
businesses and visitors to <strong>Ottawa</strong>, as well as the<br />
environment by:<br />
– Increasing Transit Capacity<br />
– Improving Reliability and Speed of Transit<br />
– Reducing Transportation Related Air Quality Impacts<br />
– Reducing Transit Costs<br />
– Accommodating Growth<br />
– Providing Economic Development<br />
– Improving the Downtown