Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line
Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line
Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
DOWNTOWN OTTAWA TRANSIT TUNNEL<br />
TO3041/TO3049<br />
PUBLIC CONSULTATION GROUP MEETING NOTES #6 Page 4 of 4<br />
Task<br />
No.<br />
Description<br />
Discussion / Status<br />
Response: That is one of the objectives, but will depend on<br />
procurement method used to build project. Contractor<br />
may prefer to shut everything down at once to<br />
complete construction faster.<br />
Question: The EA process typically has a public advisory<br />
committee to review work, will this be set-up or is it<br />
part of the PCG role?<br />
Response: The PCG serves that purpose for this study and has<br />
reviewed work to-date. EA report will be provided for<br />
independent review, and if necessary another meeting<br />
of the PCG would be called to address any major<br />
issues.<br />
3. Closure As this is likely the last meeting of the PCG, members were<br />
thanked for their participation in the study. The meeting notes and<br />
presentation will be posted on the ftp site as soon as possible. The<br />
meeting ended at 7:45 p.m.<br />
Please report on errors or omissions to Paul Croft at p.croft@delcan.com by March 3, 2010.<br />
Question/<br />
Comment<br />
David<br />
Hopper<br />
John<br />
Brennan<br />
David<br />
Hopper<br />
David<br />
Hopper<br />
<br />
Attendees:<br />
Richard Eade – PTAC<br />
John Brennan – Alta Vista Ward<br />
Rod Maclean - PTAC<br />
Dickson Davidson – Hintonburg Community Association<br />
Cam Robertson – City Centre Coalition<br />
H:\ISO\TO3041\TOB\DOCS\Public Consultation Group\Meeting6_Feb1710\PCGMeeting6_Feb1710_Draft.doc