Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line
Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line
Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Downtown <strong>Ottawa</strong> Transit Tunnel:<br />
Tunney’s Pasture to Blair Station<br />
via a Downtown LRT Tunnel<br />
Planning and<br />
Functional Design Study<br />
Presentation<br />
Public Open House #3<br />
26 October 2009<br />
Presentation Agenda<br />
• Introductions<br />
• DOTT project update<br />
• Review of the Functional Design<br />
• Implementation<br />
• Technology selection<br />
• Cost estimate<br />
• Schedule update/process moving forward<br />
• Questions<br />
Overview of Recommended Plan<br />
Tunney’s Pasture<br />
Station Overview<br />
• Western terminus of the project<br />
• Need to temporarily accommodate large numbers of<br />
transfers until Light Rail Transit is extended to Baseline<br />
Station (subject to a future Planning and Environmental<br />
Assessment)<br />
• Land used for temporary bus facilities can be repurposed<br />
for future Federal development once LRT is<br />
extended d west<br />
• Potential integration with future Tunney's Pasture<br />
redevelopment