10.04.2015 Views

Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line

Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line

Appendix A_Pages266to338_9MB.pdf - Ottawa Confederation Line

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Downtown <strong>Ottawa</strong> Transit Tunnel:<br />

Tunney’s Pasture to Blair Station<br />

via a Downtown LRT Tunnel<br />

Planning and<br />

Functional Design Study<br />

Presentation<br />

Public Open House #3<br />

26 October 2009<br />

Presentation Agenda<br />

• Introductions<br />

• DOTT project update<br />

• Review of the Functional Design<br />

• Implementation<br />

• Technology selection<br />

• Cost estimate<br />

• Schedule update/process moving forward<br />

• Questions<br />

Overview of Recommended Plan<br />

Tunney’s Pasture<br />

Station Overview<br />

• Western terminus of the project<br />

• Need to temporarily accommodate large numbers of<br />

transfers until Light Rail Transit is extended to Baseline<br />

Station (subject to a future Planning and Environmental<br />

Assessment)<br />

• Land used for temporary bus facilities can be repurposed<br />

for future Federal development once LRT is<br />

extended d west<br />

• Potential integration with future Tunney's Pasture<br />

redevelopment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!