19.04.2015 Views

Minutes 15-12-10 - Shire of Shark Bay

Minutes 15-12-10 - Shire of Shark Bay

Minutes 15-12-10 - Shire of Shark Bay

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ORDINARY COUNCIL MINUTES – <strong>15</strong> DECEMBER 20<strong>10</strong> 37<br />

Précis<br />

Mr Derek Duffy on behalf <strong>of</strong> the Water Corporation has submitted development<br />

application 20/20<strong>10</strong> for Council approval to up-grade its water treatment plant by<br />

decommissioning existing plant and equipment and installing new infrastructure.<br />

The report details the application and recommends conditional approval.<br />

Background<br />

To provide a more secure water supply to the Denham Townsite the Water<br />

Corporation proposes to construct a new Water Booster Pumping Station at the<br />

existing Denham Water Treatment Plant, Monkey Mia Road. A two compartment<br />

elevated tank is proposed with a height to the top <strong>of</strong> 17.00 metres and an external<br />

diameter <strong>of</strong> <strong>10</strong>.00 metres along with a ground level pump station for lifting saline and<br />

clear water to the tank. There will also be associated underground and vertical pipe<br />

work to the tank compartments. Site and elevation plans hereunder identify the<br />

proposal.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!