ORDINARY COUNCIL MINUTES – <strong>15</strong> DECEMBER 20<strong>10</strong> 79<br />

Moved Cr Hargreaves<br />

Seconded Cr Pepworth<br />

Officer Recommendation<br />

That the Works Committee recommend to Council that:<br />

The Council provide funding <strong>of</strong> $<strong>15</strong>,000 in the 2011/20<strong>12</strong> draft budget to<br />

establish a new fence line at a cleared width <strong>of</strong> <strong>10</strong> metres approximately 50<br />

metres further into Hamelin Station from the existing fence line that is<br />

contiguous to the northern boundary <strong>of</strong> the Butchers Track road surface.<br />

Moved: Cr Ridgley<br />

Seconded: Cr Hargreaves<br />

Amended Recommendation<br />

Reason:<br />

The Council felt that the resolution should indicate a clear benefit be for the <strong>Shire</strong><br />

and included a motion that included the gazettal <strong>of</strong> the land as part <strong>of</strong> the Road<br />

Reserve.<br />

Council Resolution<br />

The Council provide funding <strong>of</strong> $<strong>15</strong>,000 in the 2011/20<strong>12</strong> draft budget to<br />

establish a new fence line at a cleared width <strong>of</strong> <strong>10</strong> metres approximately 50<br />

metres further into Hamelin Station from the existing fence line that is<br />

contiguous to the northern boundary <strong>of</strong> the Butchers Track road surface and<br />

this section be gazetted as part <strong>of</strong> the existing road reserve.<br />

5/1 CARRIED<br />

Background<br />

The works supervisor has provided the following information in regard to the recommendation<br />

<strong>of</strong> the Works Committee meeting held at the Overlander Hall on the 19 November 20<strong>10</strong><br />

That the Works Manager research the costs to clear a fence line 11kms in<br />

length approximately 50 metres further into Hamelin Station from the current<br />

fence line on the Northern boundary <strong>of</strong> the Butchers Track at a cleared width<br />

<strong>of</strong> <strong>10</strong> metres and report back to a meeting <strong>of</strong> the Works Committee at a date to<br />

be confirmed.<br />

Contact was made with two Geraldton and one local contractor in regard to the costs involved<br />

to clear the fence line along the Butchers Track, in accordance with the recommendation<br />

made at the Works Committee meeting held on the 19 November 20<strong>10</strong>.<br />

The local contractor, although he advised his opinion, said that due to other commitments and<br />

time constraints he would not be able to do the works involved. He also advised that in his<br />

opinion the cost would be between $5,000 and $<strong>10</strong>,000 depending on availability <strong>of</strong> float for<br />

mob and demob purposes.<br />

Below is a table with three approximated prices. The general consensus was that a bull dozer<br />

in the D7 to D8 caterpillar range or equivalent would be able to clear the proposed new fence<br />

line at about 3 to 5 Km’s per day depending on the density <strong>of</strong> the vegetation to be cleared. So