ORDINARY COUNCIL MINUTES – <strong>15</strong> DECEMBER 20<strong>10</strong> 79<br />
Moved Cr Hargreaves<br />
Seconded Cr Pepworth<br />
Officer Recommendation<br />
That the Works Committee recommend to Council that:<br />
The Council provide funding <strong>of</strong> $<strong>15</strong>,000 in the 2011/20<strong>12</strong> draft budget to<br />
establish a new fence line at a cleared width <strong>of</strong> <strong>10</strong> metres approximately 50<br />
metres further into Hamelin Station from the existing fence line that is<br />
contiguous to the northern boundary <strong>of</strong> the Butchers Track road surface.<br />
Moved: Cr Ridgley<br />
Seconded: Cr Hargreaves<br />
Amended Recommendation<br />
Reason:<br />
The Council felt that the resolution should indicate a clear benefit be for the <strong>Shire</strong><br />
and included a motion that included the gazettal <strong>of</strong> the land as part <strong>of</strong> the Road<br />
Reserve.<br />
Council Resolution<br />
The Council provide funding <strong>of</strong> $<strong>15</strong>,000 in the 2011/20<strong>12</strong> draft budget to<br />
establish a new fence line at a cleared width <strong>of</strong> <strong>10</strong> metres approximately 50<br />
metres further into Hamelin Station from the existing fence line that is<br />
contiguous to the northern boundary <strong>of</strong> the Butchers Track road surface and<br />
this section be gazetted as part <strong>of</strong> the existing road reserve.<br />
5/1 CARRIED<br />
Background<br />
The works supervisor has provided the following information in regard to the recommendation<br />
<strong>of</strong> the Works Committee meeting held at the Overlander Hall on the 19 November 20<strong>10</strong><br />
That the Works Manager research the costs to clear a fence line 11kms in<br />
length approximately 50 metres further into Hamelin Station from the current<br />
fence line on the Northern boundary <strong>of</strong> the Butchers Track at a cleared width<br />
<strong>of</strong> <strong>10</strong> metres and report back to a meeting <strong>of</strong> the Works Committee at a date to<br />
be confirmed.<br />
Contact was made with two Geraldton and one local contractor in regard to the costs involved<br />
to clear the fence line along the Butchers Track, in accordance with the recommendation<br />
made at the Works Committee meeting held on the 19 November 20<strong>10</strong>.<br />
The local contractor, although he advised his opinion, said that due to other commitments and<br />
time constraints he would not be able to do the works involved. He also advised that in his<br />
opinion the cost would be between $5,000 and $<strong>10</strong>,000 depending on availability <strong>of</strong> float for<br />
mob and demob purposes.<br />
Below is a table with three approximated prices. The general consensus was that a bull dozer<br />
in the D7 to D8 caterpillar range or equivalent would be able to clear the proposed new fence<br />
line at about 3 to 5 Km’s per day depending on the density <strong>of</strong> the vegetation to be cleared. So