21.04.2015 Views

iconannual 2015 - The European Business and Investment Magazine

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OBB<br />

<strong>The</strong> principle of remote<br />

meter reading<br />

Once the railpower box is installed<br />

on the locomotive, independent<br />

transmission of data (including spatial<br />

data) is conducted via GPRS to<br />

a server of ÖBB-Infrastruktur AG.<br />

<strong>The</strong> data are read in 1-minute intervals<br />

in the Energy Data Warehouse<br />

(EDW) <strong>and</strong> allocated by country or<br />

region using GPS coordinates. Data<br />

is displayed in the EDW <strong>and</strong> the<br />

web portal for the railpower client<br />

user interface.<br />

Main components of the<br />

railpower box<br />

<strong>The</strong> railpower box consists of a<br />

combined antenna (GPS / GPRS),<br />

an intelligent modem, an EMH (AC)<br />

or LEM-meter (AC / DC), a DC/DC<br />

converter, <strong>and</strong> a GPS receiver. Power<br />

is supplied by 110 V or 24 V using<br />

the locomotive power supply. <strong>The</strong><br />

st<strong>and</strong>ard unit dimensions are 500 x<br />

400 x 150 mm, but customized sizes<br />

may be possible on request.<br />

<strong>The</strong> built-in meter (LEM or<br />

EMH) records values every minute,<br />

in both directions, for drawn down<br />

(kWh+, kWh-) <strong>and</strong> feed-in power<br />

(kvarh+ kvarh-). <strong>The</strong> combination<br />

antenna (GPS) records values for<br />

location data (longitude, latitude,<br />

speed, frequency, LEM meter) at<br />

1-minute intervals. <strong>The</strong> modem <strong>and</strong><br />

antenna combination (GPRS) save<br />

captured data <strong>and</strong> transmit them to<br />

a server of ÖBB-Infrastruktur AG.<br />

Meter reading with the railpower<br />

box allows for substantial cost<br />

transparency compared with a<br />

replacement value calculation, due<br />

to the automated minute by minute<br />

collection <strong>and</strong> billing of energy dem<strong>and</strong><br />

in real time.<br />

As a result it forms the ideal<br />

basis for environmentally friendly<br />

energy management. Railway<br />

ÖBB RAILPOWER BOX<br />

transport <strong>and</strong> infrastructure companies,<br />

locomotive manufacturers,<br />

fleet managers <strong>and</strong> leasing companies<br />

across Europe have reacted<br />

very positively to the benefits of the<br />

railpower box. Current customers<br />

include: ÖBB-Personenverkehr AG,<br />

Rail Cargo Romania, Rail Cargo<br />

Austria, Rail Cargo Hungaria, BLS<br />

Cargo, CaptrainHV LE, Wiener Lokalbahnen<br />

Cargo, MAV TRAKCIO,<br />

SLB, Westbahn, LTE, RTS, STLB.<br />

But also manufacturers <strong>and</strong> railway<br />

leasing companies are already<br />

equipted with the railpower box:<br />

Bombarider Transportation GmbH,<br />

Mitsui Rail Capital Europe, <strong>European</strong><br />

Leasing Locomotive (ELL) as<br />

well as Siemens AG.<br />

A story of success<br />

throughout Europe<br />

• Transparent data availabale<br />

24/7<br />

• Rental or purchase options<br />

• Can be used on new or existing<br />

locomotives<br />

• Autonomous system – can be<br />

customised for specific needs<br />

• Exact country <strong>and</strong> minute by<br />

minute data<br />

• Includes service package with<br />

test box<br />

• Internet application in English,<br />

German <strong>and</strong> all Eastern <strong>European</strong><br />

languages<br />

88 <strong>iconannual</strong> <strong>The</strong> <strong>European</strong> <strong>Business</strong> <strong>and</strong> <strong>Investment</strong> <strong>Magazine</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!