PROJECT-SPECIFIC EMISSION FACTOR SUMMARY<br />

Equipment<br />

Project-Specific Emissi<strong>on</strong> Factors (lb/day)<br />

Source<br />

Multiplier* NO x VOC CO SO 2 ** PM 10 PM 2.5 CO 2<br />

Grading Equipment<br />

1 41.641 2.577 15.710 0.833 2.546 2.469 4941.526<br />

Paving Equipment<br />

1 45.367 2.606 18.578 0.907 2.776 2.693 5623.957<br />

Demoliti<strong>on</strong> Equipment<br />

1 31.808 1.886 12.584 0.636 1.923 1.865 3703.074<br />

Building C<strong>on</strong>structi<strong>on</strong><br />

1 39.396 3.130 17.382 3.116 2.829 2.744 4464.512<br />

<strong>Air</strong> Compressor <str<strong>on</strong>g>for</str<strong>on</strong>g> Architectural Coating<br />

1 3.574 0.373 1.565 0.251 0.309 0.300 359.773<br />

Architectural Coating**<br />

2.445<br />

*The equipment multiplier is an integer that represents units of 10 acres <str<strong>on</strong>g>for</str<strong>on</strong>g> purposes of estimating the number of equipment required <str<strong>on</strong>g>for</str<strong>on</strong>g> the project.<br />

**Emissi<strong>on</strong> factor is from the evaporati<strong>on</strong> of solvents during painting, per "<strong>Air</strong> Quality Thresholds of Significance", SMAQMD, 1994<br />

Example: SMAQMD Emissi<strong>on</strong> Factor <str<strong>on</strong>g>for</str<strong>on</strong>g> Grading Equipment NOx = (Total Grading NOx per 10 acre)*(Equipment Multiplier)<br />

Summary of Input Parameters<br />

Total Area Total Area Total Days<br />

(ft 2 ) (acres)<br />

Grading: 587,204 13.48 5<br />

Paving: 402,952 9.25 45<br />

Demoliti<strong>on</strong>: 253,352 5.82 291<br />

Building C<strong>on</strong>structi<strong>on</strong>: 900 0.02 240<br />

Architectural Coating 900 0.02 20 (per SMAQMD "<strong>Air</strong> Quality of Thresholds of Significance", 1994)<br />

NOTE: The 'Total Days' estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> paving is calculated by dividing the total number of acres by 0.21 acres/day, which is a factor derived from the 2005 M<str<strong>on</strong>g>EA</str<strong>on</strong>g>NS<br />

Heavy C<strong>on</strong>structi<strong>on</strong> Cost Data, 19th Editi<strong>on</strong>, <str<strong>on</strong>g>for</str<strong>on</strong>g> 'Asphaltic C<strong>on</strong>crete Pavement, Lots <str<strong>on</strong>g>and</str<strong>on</strong>g> Driveways - 6" st<strong>on</strong>e base', which provides an estimate of square<br />

feet paved per day. There is also an estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> 'Plain Cement C<strong>on</strong>crete Pavement', however the estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> asphalt is used because it is more c<strong>on</strong>servative.<br />

The 'Total 'Days' estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> demoliti<strong>on</strong> is calculated by dividing the total number of acres by 0.02 acres/day, which is a factor also derived from the 2005<br />

M<str<strong>on</strong>g>EA</str<strong>on</strong>g>NS reference. This is calculated by averaging the demoliti<strong>on</strong> estimates from 'Building Demoliti<strong>on</strong> - Small Buildings, C<strong>on</strong>crete', assuming a height<br />

of 30 feet <str<strong>on</strong>g>for</str<strong>on</strong>g> a two-story building; from 'Building Footings <str<strong>on</strong>g>and</str<strong>on</strong>g> Foundati<strong>on</strong>s Demoliti<strong>on</strong> - 6" Thick, Plain C<strong>on</strong>crete'; <str<strong>on</strong>g>and</str<strong>on</strong>g> from 'Demolish, Remove<br />

Pavement <str<strong>on</strong>g>and</str<strong>on</strong>g> Curb - C<strong>on</strong>crete to 6" thick, rod rein<str<strong>on</strong>g>for</str<strong>on</strong>g>ced'. Paving is double-weighted since projects typically involve more paving demoliti<strong>on</strong>.<br />

The 'Total Days' estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> building c<strong>on</strong>structi<strong>on</strong> is assumed to be 230 days, unless project-specific data is known.<br />

Total Project Emissi<strong>on</strong>s by Activity (lbs)<br />

NO x VOC CO SO 2 PM 10 PM 2.5 CO 2<br />

Grading Equipment 208.21 12.88 78.55 4.16 12.73 12.35 24,708<br />

Paving 2,041.53 117.26 836.03 40.83 124.92 121.18 253,078<br />

Demoliti<strong>on</strong> 9,249.90 548.32 3,659.46 185.00 559.28 542.50 1,076,884<br />

Building C<strong>on</strong>structi<strong>on</strong> 9,455.12 751.15 4,171.75 747.92 678.97 658.60 1,071,483<br />

Architectural Coatings 71.48 56.36 31.31 5.02 6.19 6.00 7,195<br />

Total Emissi<strong>on</strong>s (lbs): 21,026.23 1,485.98 8,777.10 982.94 1,382.09 1,340.62 2,433,348<br />

Results: Total Project Annual Emissi<strong>on</strong> Rates<br />

NO x VOC CO SO 2 PM 10 PM 2.5 CO 2<br />

Total Project Emissi<strong>on</strong>s (lbs) 21,026.23 1,485.98 8,777.10 982.94 1,382.09 1,340.62 2,433,348<br />

Total Project Emissi<strong>on</strong>s (t<strong>on</strong>s) 10.51 0.74 4.39 0.49 0.69 0.67 1,216.67<br />

C-7 Project Combusti<strong>on</strong>