24.04.2015 Views

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

<strong>Air</strong> Educati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Training Comm<str<strong>on</strong>g>and</str<strong>on</strong>g>’s 19th <strong>Air</strong> Force. The 150th Fighter Group of the New Mexico<br />

<strong>Air</strong> Nati<strong>on</strong>al Guard is also stati<strong>on</strong>ed at the installati<strong>on</strong>. The 377 ABW provides fire protecti<strong>on</strong> (including<br />

crash <str<strong>on</strong>g>and</str<strong>on</strong>g> rescue) <str<strong>on</strong>g>for</str<strong>on</strong>g> Albuquerque Internati<strong>on</strong>al Sunport.<br />

This <str<strong>on</strong>g>EA</str<strong>on</strong>g> is organized into six secti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> appendices. Secti<strong>on</strong> 1 states the purpose, need, scope, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

public involvement ef<str<strong>on</strong>g>for</str<strong>on</strong>g>ts <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong>. Secti<strong>on</strong> 2 c<strong>on</strong>tains a detailed descripti<strong>on</strong> of the<br />

Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the alternatives c<strong>on</strong>sidered. Secti<strong>on</strong> 3 describes the existing c<strong>on</strong>diti<strong>on</strong>s of the<br />

potentially affected envir<strong>on</strong>ment. Secti<strong>on</strong> 4 identifies the envir<strong>on</strong>mental c<strong>on</strong>sequences of implementing<br />

all reas<strong>on</strong>able alternatives, including direct, indirect, <str<strong>on</strong>g>and</str<strong>on</strong>g> cumulative impacts. Secti<strong>on</strong> 5 provides the list<br />

of preparers <str<strong>on</strong>g>for</str<strong>on</strong>g> this <str<strong>on</strong>g>EA</str<strong>on</strong>g>. Secti<strong>on</strong> 6 lists the references used to support the analyses. Publicati<strong>on</strong> of this<br />

<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> will also include a signed Finding of No Significant Impact (<str<strong>on</strong>g>FONSI</str<strong>on</strong>g>) <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong>.<br />

1.2 Purpose <str<strong>on</strong>g>and</str<strong>on</strong>g> Need <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong><br />

The purpose of the Proposed Acti<strong>on</strong> is to c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a new <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, as well as<br />

related comp<strong>on</strong>ents such as a taxiway, security measures, <str<strong>on</strong>g>and</str<strong>on</strong>g> lighting, at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> to ensure reliable<br />

support <str<strong>on</strong>g>and</str<strong>on</strong>g> backup <str<strong>on</strong>g>for</str<strong>on</strong>g> the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5).<br />

Pad 5 is the <strong>on</strong>ly <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> with a sufficient surrounding clear z<strong>on</strong>e to accommodate <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> (i.e., weap<strong>on</strong>s, ammuniti<strong>on</strong>, explosives, <str<strong>on</strong>g>and</str<strong>on</strong>g> other hazardous <str<strong>on</strong>g>cargo</str<strong>on</strong>g>). However, Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its<br />

taxiway are in poor c<strong>on</strong>diti<strong>on</strong> due to cracking, spalling, <str<strong>on</strong>g>and</str<strong>on</strong>g> failing of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>’s Portl<str<strong>on</strong>g>and</str<strong>on</strong>g> cement c<strong>on</strong>crete<br />

caused by alkali-silica reactivity (ASR), <str<strong>on</strong>g>and</str<strong>on</strong>g> disintegrati<strong>on</strong> of the taxiway’s asphalt due to age. The<br />

deficient c<strong>on</strong>diti<strong>on</strong> of Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its taxiway have the potential to jeopardize aircraft safety, <str<strong>on</strong>g>and</str<strong>on</strong>g> delay or<br />

abort critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s due to <str<strong>on</strong>g>for</str<strong>on</strong>g>eign object damage (FOD) <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft tire-cut potential. In<br />

additi<strong>on</strong>, the existing lighting at Pad 5 is not sufficient <str<strong>on</strong>g>and</str<strong>on</strong>g> further jeopardizes aircraft safety. During the<br />

past 5 years, approximately $1 milli<strong>on</strong> has been spent <strong>on</strong> repairs to the <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> taxiway, but a stable state<br />

of repair is difficult due to its c<strong>on</strong>tinual use <str<strong>on</strong>g>and</str<strong>on</strong>g> repairs are <strong>on</strong>going. Hot <str<strong>on</strong>g>cargo</str<strong>on</strong>g> is c<strong>on</strong>tinuously flown in<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> out of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, a <str<strong>on</strong>g>pad</str<strong>on</strong>g> capable of h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> must be missi<strong>on</strong>-ready at all<br />

times. The need <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong> is to increase the reliability, safety, <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> capacity of the<br />

available <str<strong>on</strong>g>pad</str<strong>on</strong>g>s able to accommodate <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> to ensure that this critical missi<strong>on</strong> can be fulfilled.<br />

1.3 Scope of the <str<strong>on</strong>g>EA</str<strong>on</strong>g><br />

Scope c<strong>on</strong>sists of the range of acti<strong>on</strong>s, alternatives, <str<strong>on</strong>g>and</str<strong>on</strong>g> impacts to be c<strong>on</strong>sidered. The scope of the<br />

Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the range of alternatives c<strong>on</strong>sidered are presented in detail in Secti<strong>on</strong> 2. In<br />

accordance with CEQ regulati<strong>on</strong>s implementing NEPA (40 CFR 1502.14), the No Acti<strong>on</strong> Alternative is<br />

analyzed to provide the baseline against which the envir<strong>on</strong>mental impacts of implementing the range of<br />

alternatives addressed can be compared. This <str<strong>on</strong>g>EA</str<strong>on</strong>g> identifies appropriate mitigati<strong>on</strong> measures <str<strong>on</strong>g>and</str<strong>on</strong>g> best<br />

management practices (BMPs) that are not already included in the Proposed Acti<strong>on</strong> or alternatives to<br />

avoid, minimize, reduce, or compensate <str<strong>on</strong>g>for</str<strong>on</strong>g> adverse envir<strong>on</strong>mental impacts. This <str<strong>on</strong>g>EA</str<strong>on</strong>g> examines the<br />

envir<strong>on</strong>mental impacts of the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> reas<strong>on</strong>able alternatives <strong>on</strong> the following resource<br />

areas: l<str<strong>on</strong>g>and</str<strong>on</strong>g> use, noise, visual resources, air quality, geology <str<strong>on</strong>g>and</str<strong>on</strong>g> soils, water resources, biological<br />

resources, cultural resources, infrastructure, hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> waste, safety, aircraft safety, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

socioec<strong>on</strong>omics <str<strong>on</strong>g>and</str<strong>on</strong>g> envir<strong>on</strong>mental justice. The resource areas that do not apply are eliminated from<br />

further analysis in Secti<strong>on</strong> 3.<br />

1.3.1 Envir<strong>on</strong>mental Laws, Regulati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> Executive Orders<br />

To comply with NEPA (Public Law 91-190, 42 U.S.C. 4321 et seq.), the planning <str<strong>on</strong>g>and</str<strong>on</strong>g> decisi<strong>on</strong>making<br />

process involves a study of other relevant envir<strong>on</strong>mental laws, regulati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> Executive Orders (EOs).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

1-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!