Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

2.1.1 Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong><br />

Prior to c<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, existing aboveground infrastructure, including light<br />

poles, pers<strong>on</strong>nel shelter, storage shed, fencing, utility infrastructure, protective bollards, <str<strong>on</strong>g>and</str<strong>on</strong>g> lago<strong>on</strong><br />

infrastructure (berms <str<strong>on</strong>g>and</str<strong>on</strong>g> fencing), within the footprint of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be removed. Some<br />

infrastructure, including a pers<strong>on</strong>nel shelter <str<strong>on</strong>g>and</str<strong>on</strong>g> DFPs, would be relocated to the perimeter of the<br />

proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g>. No lago<strong>on</strong> infrastructure would be rebuilt after c<strong>on</strong>structi<strong>on</strong> is complete. M<strong>on</strong>itoring wells<br />

associated with WP-26 that are within the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> footprint would be modified to make the well<br />

head <str<strong>on</strong>g>and</str<strong>on</strong>g> cover flush with the ground surface. A small asphalt parking <str<strong>on</strong>g>and</str<strong>on</strong>g> storage area <str<strong>on</strong>g>for</str<strong>on</strong>g> mobile<br />

lighting equipment northeast of Pad 5 would be demolished, <str<strong>on</strong>g>and</str<strong>on</strong>g> the equipment would be relocated. The<br />

perimeter road <strong>on</strong> the eastern side of Pad 5 would be demolished. The locati<strong>on</strong> of all underground<br />

utilities would be verified to the extent possible be<str<strong>on</strong>g>for</str<strong>on</strong>g>e commencement of ground disturbing activities.<br />

C<strong>on</strong>structi<strong>on</strong> activities would involve grading of the ground surface, <str<strong>on</strong>g>and</str<strong>on</strong>g> applicati<strong>on</strong> of base material <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

18-inch-thick Portl<str<strong>on</strong>g>and</str<strong>on</strong>g> cement c<strong>on</strong>crete <str<strong>on</strong>g>pad</str<strong>on</strong>g>. A paved shoulder would be c<strong>on</strong>structed around the<br />

perimeter of the <str<strong>on</strong>g>pad</str<strong>on</strong>g> to protect adjacent areas from jet blast, help mitigate FOD risk, permit equipment<br />

storage, <str<strong>on</strong>g>and</str<strong>on</strong>g> to facilitate drainage. The surface adjacent to the paved shoulder would be graded to<br />

facilitate drainage <str<strong>on</strong>g>and</str<strong>on</strong>g> to prevent storm water from p<strong>on</strong>ding <strong>on</strong> the outside edge of the shoulder. Existing<br />

light poles surrounding Pad 5 would be removed, <str<strong>on</strong>g>and</str<strong>on</strong>g> new mast light poles would be installed around the<br />

perimeter of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad 5. Additi<strong>on</strong>al DFPs <str<strong>on</strong>g>and</str<strong>on</strong>g> at least <strong>on</strong>e pers<strong>on</strong>nel shelter would be<br />

c<strong>on</strong>structed <strong>on</strong> the perimeter of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g>. Some existing anti-ram cabling would be relocated,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> new cabling would be added in order to surround the perimeter of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad<br />

5. Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> replacement of the existing asphalt taxiway (leading to Pad 5) would occur after<br />

c<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. Asphalt from the taxiway, small parking <str<strong>on</strong>g>and</str<strong>on</strong>g> storage area,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> perimeter road would be crushed <str<strong>on</strong>g>and</str<strong>on</strong>g> screened if rebar is not present.<br />

Dumpsters would be provided <str<strong>on</strong>g>for</str<strong>on</strong>g> municipal solid waste generated by c<strong>on</strong>structi<strong>on</strong> activity at the project<br />

site. The asphalt waste from demoliti<strong>on</strong> of the taxiway would be transported to the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> recycling or disposal. If necessary, hazardous c<strong>on</strong>structi<strong>on</strong> debris would be transported to the Rio<br />

Rancho L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill, since the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill accepts <strong>on</strong>ly n<strong>on</strong>hazardous demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong><br />

waste. To the extent possible, materials would be diverted from l<str<strong>on</strong>g>and</str<strong>on</strong>g>fills <str<strong>on</strong>g>and</str<strong>on</strong>g> either recycled or reused.<br />

Cardboard wastes would be separated <str<strong>on</strong>g>for</str<strong>on</strong>g> pickup <str<strong>on</strong>g>and</str<strong>on</strong>g> would be recycled as a functi<strong>on</strong> of the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

Qualified Recycling Program. Miscellaneous salvageable metals would be transported to the Defense<br />

Reutilizati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Marketing Office <str<strong>on</strong>g>for</str<strong>on</strong>g> recycling or reuse. In additi<strong>on</strong>, clean fill material, ground up<br />

asphalt, <str<strong>on</strong>g>and</str<strong>on</strong>g> broken up cement would be diverted from l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill disposal <str<strong>on</strong>g>and</str<strong>on</strong>g> reused whenever possible.<br />

Equipment such as bulldozers, backhoes, fr<strong>on</strong>t-end loaders, dump trucks, tractor-trailers, c<strong>on</strong>crete mixers,<br />

asphalt vehicles, <str<strong>on</strong>g>and</str<strong>on</strong>g> generators would be required to support the proposed demoliti<strong>on</strong>, site preparati<strong>on</strong>,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities. Sufficient amounts of fuels, hydraulic fluids, oils, <str<strong>on</strong>g>and</str<strong>on</strong>g> lubricants would be<br />

stored <strong>on</strong> site during the project to support c<strong>on</strong>tractor vehicles <str<strong>on</strong>g>and</str<strong>on</strong>g> machinery. No other hazardous<br />

materials would be stored <strong>on</strong> site. All material needs, such as c<strong>on</strong>crete <str<strong>on</strong>g>and</str<strong>on</strong>g> asphalt, would be supplied by<br />

offsite vendors. C<strong>on</strong>structi<strong>on</strong> activities would require small amounts of electricity; however, no natural<br />

gas or steam would be required <str<strong>on</strong>g>for</str<strong>on</strong>g> demoliti<strong>on</strong> or c<strong>on</strong>structi<strong>on</strong>. If a dust nuisance or hazard has the<br />

potential to occur during demoliti<strong>on</strong> or c<strong>on</strong>structi<strong>on</strong>, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would supply water to be used <str<strong>on</strong>g>for</str<strong>on</strong>g> dust<br />

c<strong>on</strong>trol. Water would be applied by water trucks <str<strong>on</strong>g>and</str<strong>on</strong>g> sprayers. Due to the area of l<str<strong>on</strong>g>and</str<strong>on</strong>g> disturbance that<br />

would occur during demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities, the Proposed Acti<strong>on</strong> would require Nati<strong>on</strong>al<br />

Pollutant Discharge Eliminati<strong>on</strong> System (NPDES) permit coverage <str<strong>on</strong>g>and</str<strong>on</strong>g> preparati<strong>on</strong> of a Storm Water<br />

Polluti<strong>on</strong> Preventi<strong>on</strong> Plan (SWPPP), <str<strong>on</strong>g>and</str<strong>on</strong>g> a fugitive dust-c<strong>on</strong>trol c<strong>on</strong>structi<strong>on</strong> permit from the AEHD-<br />

AQD.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />