24.04.2015 Views

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

cliff. Alternative Site 3 has been eliminated from further detailed analysis due to safety <str<strong>on</strong>g>and</str<strong>on</strong>g> security<br />

issues that would make this alternative infeasible.<br />

Alternative Site 4. Alternative Site 4 is southeast of Pad 5, <str<strong>on</strong>g>and</str<strong>on</strong>g> would abut an approximately 90-foot cliff<br />

(into Tijeras Arroyo) to the south. This alternative’s locati<strong>on</strong> next to a cliff presents dangerous c<strong>on</strong>diti<strong>on</strong>s<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, including movement of pers<strong>on</strong>nel; maneuvering of aircraft<br />

within the <str<strong>on</strong>g>pad</str<strong>on</strong>g>; <str<strong>on</strong>g>and</str<strong>on</strong>g> placement of access roads, lighting, drainage, AT/FP measures, <str<strong>on</strong>g>and</str<strong>on</strong>g> associated<br />

equipment <strong>on</strong> the perimeter of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The presence of the cliff presents additi<strong>on</strong>al security issues <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

pers<strong>on</strong>nel guarding the aircraft <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> due to potentially obstructed sightlines to locati<strong>on</strong>s below the<br />

cliff. In additi<strong>on</strong>, this alternative would be entirely within an ERP site (WP-26), which could present<br />

additi<strong>on</strong>al c<strong>on</strong>structi<strong>on</strong> costs due to infrastructure removal <str<strong>on</strong>g>and</str<strong>on</strong>g> remediati<strong>on</strong> activities. Alternative Site 4<br />

has been eliminated from further detailed analysis due to safety <str<strong>on</strong>g>and</str<strong>on</strong>g> security issues that would make this<br />

alternative infeasible.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

2-7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!