<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />
Proposed Acti<strong>on</strong> would not violate local z<strong>on</strong>ing ordinances because municipal z<strong>on</strong>ing regulati<strong>on</strong>s do not<br />
apply to Federal property. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would not result in any impacts <strong>on</strong> municipal<br />
l<str<strong>on</strong>g>and</str<strong>on</strong>g> use plans or policies.<br />
The Proposed Acti<strong>on</strong> would not preclude the viability of existing l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses, or the c<strong>on</strong>tinued use <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
occupati<strong>on</strong> of surrounding areas. The proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be compatible with the surrounding<br />
<strong>Air</strong>craft Operati<strong>on</strong>s/Maintenance <str<strong>on</strong>g>and</str<strong>on</strong>g> Open Space l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would result<br />
in no impacts <strong>on</strong> existing l<str<strong>on</strong>g>and</str<strong>on</strong>g> use viability or c<strong>on</strong>tinued l<str<strong>on</strong>g>and</str<strong>on</strong>g> occupati<strong>on</strong>.<br />
Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities would produce temporary, elevated noise levels that could be heard<br />
by pers<strong>on</strong>s immediately surrounding the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site (see Secti<strong>on</strong> 4.2.2 <str<strong>on</strong>g>for</str<strong>on</strong>g> envir<strong>on</strong>mental<br />
c<strong>on</strong>sequences related to noise). Operati<strong>on</strong> of the Proposed Acti<strong>on</strong> would not produce increase noise<br />
above ambient noise levels because the type <str<strong>on</strong>g>and</str<strong>on</strong>g> quantity of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> operati<strong>on</strong>s at the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not<br />
change from existing c<strong>on</strong>diti<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> there would be no increase in the quantity of aircraft utilizing the<br />
<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s. The Proposed Acti<strong>on</strong> would not result in significant impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use compatibility<br />
from noise producti<strong>on</strong>.<br />
As discussed in Secti<strong>on</strong> 3.1.2, several l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses <str<strong>on</strong>g>and</str<strong>on</strong>g> acti<strong>on</strong>s, including use of explosives <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />
development of people-intensive facilities not associated with flightline operati<strong>on</strong>s or other essential<br />
functi<strong>on</strong>s that must be sited within the Clear Z<strong>on</strong>e, are prohibited within the Runway 26 Clear Z<strong>on</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
APZ I (USAF 1999). Major Comm<str<strong>on</strong>g>and</str<strong>on</strong>g>/Civil Engineering must approve alterati<strong>on</strong>s, minor additi<strong>on</strong>s, or<br />
improvements to existing facilities, <str<strong>on</strong>g>and</str<strong>on</strong>g> the c<strong>on</strong>structi<strong>on</strong> of new facilities in the Clear Z<strong>on</strong>e. The<br />
Proposed Acti<strong>on</strong> would be c<strong>on</strong>sistent with these regulati<strong>on</strong>s as it is a facility associated with flightline<br />
operati<strong>on</strong>s that must be within the Clear Z<strong>on</strong>e in order to provide service to <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> aircraft missi<strong>on</strong>s.<br />
There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, with approval from Major Comm<str<strong>on</strong>g>and</str<strong>on</strong>g>/Civil Engineering, the Proposed Acti<strong>on</strong> would comply<br />
with these regulati<strong>on</strong>s. The Proposed Acti<strong>on</strong> would not c<strong>on</strong>flict with planning criteria established to<br />
ensure the safety <str<strong>on</strong>g>and</str<strong>on</strong>g> protecti<strong>on</strong> of human life <str<strong>on</strong>g>and</str<strong>on</strong>g> property due to close proximity to an airport. Lessthan-significant<br />
impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use compatibility from safety issues related to proximity to an airport.<br />
The Proposed Acti<strong>on</strong> would require the establishment of a 1,250-foot QD arc, <str<strong>on</strong>g>and</str<strong>on</strong>g> would also be within<br />
the existing 1,250-foot QD arc <str<strong>on</strong>g>for</str<strong>on</strong>g> Pad 5. Operati<strong>on</strong> of both <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would be c<strong>on</strong>sidered<br />
compatible l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses because operati<strong>on</strong> of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not occur simultaneously, rather each <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />
would act as c<strong>on</strong>tingency if the other <str<strong>on</strong>g>pad</str<strong>on</strong>g> is unavailable. Prior to commencement of any work within the<br />
existing QD arc, all <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> roadway c<strong>on</strong>structi<strong>on</strong>, utilities, <str<strong>on</strong>g>and</str<strong>on</strong>g> electromagnetic radiati<strong>on</strong> sources must<br />
be coordinated with 377 ABW Weap<strong>on</strong>s Safety to determine if an explosives site plan (ESP) is required;<br />
<str<strong>on</strong>g>and</str<strong>on</strong>g> if an ESP is required, work cannot start until approval is granted by DDESB or Major Comm<str<strong>on</strong>g>and</str<strong>on</strong>g>.<br />
Operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be c<strong>on</strong>sistent with AFMAN 91-201. Compliance with<br />
these policies would ensure that the Proposed Acti<strong>on</strong> would result in less than significant impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g><br />
use compatibility from safety issues related to QD arcs.<br />
4.1.2.2 No Acti<strong>on</strong> Alternative<br />
Under the No Acti<strong>on</strong> Alternative, the Proposed Acti<strong>on</strong> would not be implemented <str<strong>on</strong>g>and</str<strong>on</strong>g> existing l<str<strong>on</strong>g>and</str<strong>on</strong>g> use<br />
c<strong>on</strong>diti<strong>on</strong>s would remain the same as discussed in Secti<strong>on</strong> 3.1.2. No impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use would be<br />
expected.<br />
Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />
4-2