<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />
4.9.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />
4.9.2.1 Proposed Acti<strong>on</strong><br />
Electrical Systems. The Proposed Acti<strong>on</strong> would require minimal amounts of electricity during<br />
c<strong>on</strong>structi<strong>on</strong> activities; however, because these activities would be limited to a short period (12- to<br />
14-m<strong>on</strong>th durati<strong>on</strong>), the increase in electrical dem<str<strong>on</strong>g>and</str<strong>on</strong>g> would <strong>on</strong>ly be temporary. Electrical service<br />
interrupti<strong>on</strong>s might be experienced should aboveground or underground electrical cables need to be<br />
rerouted outside of the proposed work area. Service interrupti<strong>on</strong>s might also be experienced when the<br />
lighting infrastructure <str<strong>on</strong>g>for</str<strong>on</strong>g> the existing <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s is c<strong>on</strong>nected to the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />
electrical system.<br />
Following the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>, the overall electrical dem<str<strong>on</strong>g>and</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />
would increase negligibly due to the added lighting infrastructure. As such, the Proposed Acti<strong>on</strong> would<br />
not result in significant effects <strong>on</strong> electrical systems.<br />
Natural Gas Systems. The Proposed Acti<strong>on</strong> would not alter the amount of natural gas used at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />
<strong>AFB</strong>. Natural gas would not be used during c<strong>on</strong>structi<strong>on</strong> activities, <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />
<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would not require natural gas service.<br />
Liquid Fuel. The Proposed Acti<strong>on</strong> would not alter the quantities of liquid fuels (JP-8, diesel, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
gasoline) used at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> nor would it affect their h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling <str<strong>on</strong>g>and</str<strong>on</strong>g> storage. The Proposed Acti<strong>on</strong><br />
would not change aircraft or l<str<strong>on</strong>g>and</str<strong>on</strong>g>-based vehicle traffic volumes; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, liquid fuel dem<str<strong>on</strong>g>and</str<strong>on</strong>g> would<br />
remain unchanged.<br />
Central Heating <str<strong>on</strong>g>and</str<strong>on</strong>g> Cooling Systems. The Proposed Acti<strong>on</strong> would not impact the central heating<br />
system of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Central heating resources would not be used during c<strong>on</strong>structi<strong>on</strong> activities, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> facilities would not require central heating service.<br />
Water Supply Systems. C<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would require minimal amounts of<br />
water, primarily <str<strong>on</strong>g>for</str<strong>on</strong>g> dust-suppressi<strong>on</strong> purposes. This water would be obtained from the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />
water supply system, <str<strong>on</strong>g>and</str<strong>on</strong>g> because c<strong>on</strong>structi<strong>on</strong> activities would be limited to a short period, the increase<br />
in water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> would <strong>on</strong>ly be temporary. Water service interrupti<strong>on</strong>s might be experienced should<br />
underground water lines need to be rerouted outside of the proposed work area. Service interrupti<strong>on</strong>s<br />
might also be experienced when the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> facilities are c<strong>on</strong>nected to the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />
water supply system.<br />
Following the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>, the overall water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> could<br />
increase due to the added infrastructure at the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance<br />
activities. However, because the proposed <str<strong>on</strong>g>and</str<strong>on</strong>g> existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not be used simultaneously<br />
<str<strong>on</strong>g>and</str<strong>on</strong>g> the volume of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> traffic at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would remain unchanged, the potential increase in<br />
water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> from the use of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be largely offset by the reducti<strong>on</strong> in use<br />
of Pad 5. Any potential increase in water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> from the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would<br />
be negligible in magnitude <str<strong>on</strong>g>and</str<strong>on</strong>g> within the current available capacity of the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> water supply<br />
system. As such, the Proposed Acti<strong>on</strong> would result in adverse effects <strong>on</strong> water systems; however, these<br />
effects would be expected to be less than significant.<br />
Sanitary Sewer <str<strong>on</strong>g>and</str<strong>on</strong>g> Wastewater Systems. The Proposed Acti<strong>on</strong> would not impact the sanitary sewer <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
wastewater systems of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Wastewater service would not be required <str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong><br />
activities or during operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>.<br />
Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />
4-15