AZ-225 Install Manual
AZ-225 Install Manual
AZ-225 Install Manual
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
5.1) THE <strong>AZ</strong>MUTH MOTOR TERMINAL STRIP (PRE-WIRED AT THE FACTORY)<br />
It is unlikely that you will need to access the wiring inside the Azimuth Motor. The Azimuth Motor Terminal<br />
Strip is pre-wired at the factory. It serves as a central connection point for motor power wires. The 4-wire<br />
Controller output lead and the Elevation Actuator lead share entry into the Azimuth Motor Cover through<br />
the rain tight plastic strain relief.<br />
A four-wire lead enters in from the Controller and is divided into two pairs. The first pair (White & Green)<br />
controls the East-West Azimuth movement. The second pair (Red & Black) “passes through” and controls<br />
the North-South elevation movement. The Elevation Actuator power lead exits azimuth motor cover<br />
through the strain relief and will be connected to the actuator motor by the installer.<br />
.<br />
<strong>AZ</strong>-<strong>225</strong> <strong>AZ</strong>IMUTH MOTOR WIRE CONNECTIONS<br />
22