AZ-225 Install Manual
AZ-225 Install Manual
AZ-225 Install Manual
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TABLE OF CONTENTS<br />
SECTION TITLE<br />
PAGE<br />
1 <strong>Install</strong>ation of the Tracker Pipe Mast and Foundation. 5<br />
2 <strong>Install</strong> the Azimuth Gear Drive Assembly on Top of the Pipe Mast 6<br />
3 <strong>Install</strong> the Fork Extensions, Torque Tube & Elevation Actuator 8<br />
4 <strong>Install</strong>ing the Module Support Frame 11<br />
5 <strong>Install</strong>ing a Wattsun Solar Tracker Controller 18<br />
6 Power Connection to the Elevation Actuator 25<br />
7 Power Connection to the Tracker Controller 26<br />
8 Setting Preferences and Operating the Tracker Controller 30<br />
9 Setting the <strong>AZ</strong> Motor Limits 32<br />
10 <strong>Manual</strong> Control Option 33<br />
11 Periodic Maintenance 34<br />
12 Suggested Methods for Grounding a Tracker 35<br />
13 Array Technologies, Inc. Limited Warranty 39<br />
4