FIG 2: TYPICAL GROUNDING OF A TRACKER TO THE BATTERY BANK/POWERCENTER.<br />
• The modules, Wattsun Tracker, and mounting pipe are grounded as shown in Figure 1.<br />
• The normal, (primary bond) negative-to-ground bonding is required in the power center or ground-fault<br />
device.<br />
• The negative current-carrying (PV Negative) conductor is bonded (connected) to the grounding system at<br />
the power center or charge controller.<br />
• An equipment-grounding conductor is run from the PV array to the power center or charge controller.<br />
WARNING!<br />
If you ground according to FIG 2, you must ground the PV Negative at the power center, not at the array. There<br />
can only be one ground for the current carrying conductor (PV Negative) in this situation.<br />