13.05.2015 Views

AZ-225 Install Manual

AZ-225 Install Manual

AZ-225 Install Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FIG 2: TYPICAL GROUNDING OF A TRACKER TO THE BATTERY BANK/POWERCENTER.<br />

• The modules, Wattsun Tracker, and mounting pipe are grounded as shown in Figure 1.<br />

• The normal, (primary bond) negative-to-ground bonding is required in the power center or ground-fault<br />

device.<br />

• The negative current-carrying (PV Negative) conductor is bonded (connected) to the grounding system at<br />

the power center or charge controller.<br />

• An equipment-grounding conductor is run from the PV array to the power center or charge controller.<br />

WARNING!<br />

If you ground according to FIG 2, you must ground the PV Negative at the power center, not at the array. There<br />

can only be one ground for the current carrying conductor (PV Negative) in this situation.<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!