<strong>Condit</strong> <strong>Dam</strong> Hydroelectric Project<br />

Final Supplemental EIS<br />

Based on the project description and management plans provided by PacifiCorp, URS<br />

assembled an inventory of operations and equipment that would generate noise during each<br />

phase of construction. Table 4.8-2 summarizes the operations associated with the Proposed<br />

Action, and the types and numbers of equipment that are expected to be operating during<br />

each phase of work. Reference noise emission data for blasting and each piece of equipment<br />

(compiled during previous construction noise assessments conducted by URS for similar<br />

projects) are also summarized in Table 4.8-2. For the purposes of this assessment, each piece<br />

of equipment was assumed to operate continuously during daytime hours (defined by<br />

Skamania County and Ecology as 7:00 am to 10:00 pm), Monday through Friday. Predictive<br />

noise modeling and potential noise impacts for each activity related to the Proposed Action<br />

are described in the following sections.<br />

Table 4.8-2<br />

Anticipated Noise Sources<br />

Action<br />

Pre-<strong>Dam</strong> <strong>Removal</strong> Activities<br />

Hardware <strong>Removal</strong> & Tunneling<br />

<strong>Dam</strong> Breaching & <strong>Removal</strong><br />

Concrete <strong>Dam</strong> Demolition<br />

Concrete <strong>Removal</strong>, Storage, Disposal<br />

Coffer <strong>Dam</strong> <strong>Removal</strong><br />

Wood Stave Pipeline <strong>Removal</strong> &<br />

Disposal<br />

Concrete Surge Tank <strong>Removal</strong> &<br />

Disposal<br />

Power Facilities <strong>Removal</strong> & Disposal<br />

Sources<br />

Reference<br />

Noise Level<br />

Reference<br />

Distance<br />

Number<br />

On Site<br />

Blasting 122 dBPeak a ¼ mile c NA<br />

Drill rig 74 dBA b 200 feet 1<br />

Rough terrain crane 88 dBA 50 feet 1<br />

Barge-mounted clamshell crane 88 dBA 50 feet 1<br />

Loader 85 dBA 50 feet 2<br />

Excavator 82 dBA 50 feet 2<br />

Dozer 85 dBA 50 feet 2<br />

Truck 88 dBA 50 feet 10<br />

Pickup 72 dBA 50 feet 2<br />

Blasting 122 dBPeak NA NA<br />

Crane 88 dBA 50 feet 1<br />

Loader 85 dBA 50 feet 2<br />

Dozer 85 dBA 50 feet 2<br />

Truck 88 dBA 50 feet 10<br />

Pickup 72 dBA 50 feet 2<br />

Crane 88 dBA 50 feet 1<br />

Loader 85 dBA 50 feet 2<br />

Excavator 82 dBA 50 feet 2<br />

Scraper 89 dBA 50 feet 2<br />

Dozer 85 dBA 50 feet 2<br />

Truck 88 dBA 50 feet 10<br />

Pickup 72 dBA 50 feet 2<br />

Blasting 122 dBPeak NA NA<br />

Crane 88 dBA 50 feet 1<br />

Loader 85 dBA 50 feet 2<br />

Dozer 85 dBA 50 feet 2<br />

Truck 88 dBA 50 feet 10<br />

Pickup 72 dBA 50 feet 2<br />

Loader 85 dBA 50 feet 2<br />

Truck 88 dBA 50 feet 10<br />

Pickup 72 dBA 50 feet 2<br />

Blasting 122 dBPeak NA NA<br />

Drill rig 74 dBA 200 feet 1<br />

Loader 85 dBA 50 feet 2<br />

Excavator 82 dBA 50 feet 2<br />

Scraper 89 dBA 50 feet 2<br />

Truck 88 dBA 50 feet 10<br />

Pickup 72 dBA 50 feet 2<br />

Loader 85 dBA 50 feet 1<br />

Dozer 85 dBA 50 feet 10<br />

Pickup 72 dBA 50 feet 2<br />

4.8-4